My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TILLIE LEWIS
>
1444
>
2900 - Site Mitigation Program
>
PR0516538
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 2:01:12 PM
Creation date
5/8/2020 1:53:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516538
PE
2950
FACILITY_ID
FA0005401
FACILITY_NAME
EVERGREEN GLASS INC
STREET_NUMBER
1444
STREET_NAME
TILLIE LEWIS
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16335003
CURRENT_STATUS
01
SITE_LOCATION
1444 TILLIE LEWIS DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Advanced <br /> GeoEnvironmental, Inc . <br /> 06 October 2000 <br /> AGE-NC Project No. 00-0768 <br /> Ms. Carol Oz <br /> SAN JOAQUIN COUNTY PHS-EHD <br /> 304 East Weber Avenue, 3'Floor <br /> Stockton, CA 95201 <br /> T-a <br /> Subject: Phase H Site Assessment Work Plan Addendum <br /> FORMER LAIDLAW FACILITY D <br /> 1444 Tillie Lewis Drive,Stockton, California <br /> N <br /> Cil <br /> Dear Ms. Oz: is <br /> A Phase 11 Site Assessment Work Plan was recently submitted to the San Joaquin County Public Health <br /> Services-Environmental Health Division (PHS-EHD) by Advanced GeoEnvironmental, Inc. (AGE) on 04 <br /> October 2000 for the advancement of five(5)soil probe borings at the above referenced site. This addendum <br /> is being submitted to modify the scope of work. <br /> In addition to the 5 soil probe borings proposed,AGE proposes an additional 3 probe borings to be advanced <br /> at 1444 Tillie Lewis Drive. The additional probe borings will be advanced to 10 feet below surface grade. <br /> All field procedures for the advancement of soil probe borings will be performed as described in the 04. <br /> October 2000 work plan.A revised site map indicating all probe boring locations is attached(See figure 1). <br /> Upon completion of the field work and receipt of the final laboratory analysis, a report will be prepared <br /> presenting the findings of the investigation. <br /> If you have any questions or require further information,please contact our office at(209)467-1006. <br /> Sincerely, <br /> Advanced GeoEnvironmental,Inc. <br /> 41 V <br /> _—_— <br /> BrianMillman Ro ert E.M <br /> Staff Geologist Project Geologist/Director of Operations <br /> cc: Ron Van De Pol -Van De Pol Enterprises <br /> 4005 North Wilson Way,Stockton, California 95205 <br /> Telephone(209)467-1006 FAX(209)467-1119 - - <br />
The URL can be used to link to this page
Your browser does not support the video tag.