My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TILLIE LEWIS
>
1444
>
2900 - Site Mitigation Program
>
PR0516538
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 2:01:12 PM
Creation date
5/8/2020 1:53:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516538
PE
2950
FACILITY_ID
FA0005401
FACILITY_NAME
EVERGREEN GLASS INC
STREET_NUMBER
1444
STREET_NAME
TILLIE LEWIS
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16335003
CURRENT_STATUS
01
SITE_LOCATION
1444 TILLIE LEWIS DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1444 TILLIE LEWIS <br /> STOCKTON CA <br /> CHRONOLOGY <br /> TANK #1 4000 GALLON XYLENE REMOVED 06-29-90 <br /> 06-29-90 One 4000 gallon xylene tank removed this date under permit and <br /> inspection of PHS-EHD. The inspector noted the steel tank to be in <br /> poor condition with corrosion and pitting on the bottom. Two soil <br /> samples were obtained from beneath the tank at approx. 12' bgs in <br /> loamiday soil. The soil was discolored and had strong petroleum odors. <br /> 07-18-90 PHS-EHD receives soil sample results. The results are shown below. <br /> Initial Laboratory :analysis - Soil <br /> Laidlaw Corporation <br /> Stockton, CA <br /> (in PPM) <br /> QRTE ,, ? S:aMPLE liI 8< T X17: <br /> TPHC <br /> 06/29/90 LS-TP 1-12'N ( NO I 10 740 5,220 8,000 <br /> LS-TP 1-12'S I NO 42 I 4,700 I 27,100 I 47,000 <br /> METHOD DETECTION LIMIT I 10 I 10 I 10 ( 10 I 2.000 <br /> 07-24-90 PHS-EHD files prop 65 and UAR this date. <br /> 03-0491 PHS-EHD receives workplan to over-excavate the former tank pit area. <br /> 03-11-91 PHS-EHD places site into the LOP this date. <br /> 03-19-91 Former tank pit over-excavated this date. Final dimensions are <br /> 40'x35'x14'. Approx. 750 cubic yards of soil removed from the pit. Six <br /> sidewall and 4 bottom samples were. collected from the finished <br /> excavation. <br /> 03-27-91 Three monitoring g wells installed this date. <br /> 06-10-91 PHS-EHD receives verbal groundwater results that indicate groundwater <br /> has been impacted. PHS-EHD updates MFR and prop 65 notification <br /> this date. <br />
The URL can be used to link to this page
Your browser does not support the video tag.