Laserfiche WebLink
ADMINISTRATIVE CIVIL LIABILITY ORDER NO. 5-01-281 -4 - <br /> R. <br /> 4 - <br /> R. LAWSON ENTERPRISES, LLC DBA WILDROSE VINEYARDS <br /> SAN JOAQUIN COUNTY <br /> subdivision (b)of Section 13399.2, or falsifying any information provided therein, is guilty of a <br /> misdemeanor and may be liable civilly in accordance with subdivision (b)." <br /> 15. Water Code Section 13268(b)(1) states: <br /> "Civil liability may be administratively imposed by a regional board in accordance with Article 2.5 <br /> (commencing with Section 13323) of Chapter 5 for a violation of subdivision(a) in an amount which shall <br /> not exceed one thousand dollars ($1,000) for each day in which the violation occurs." <br /> 16. Water Code Section 13327 states: <br /> "In determining the amount of civil liability, the regional board ... shall take into account the nature, <br /> circumstances,extent, and gravity of the violation or violations, whether the discharge is susceptible to <br /> cleanup or abatement, the degree of toxicity of the discharge, and,with respect to the violator,the ability to <br /> pay, the effect on ability to continue in business, any voluntary cleanup efforts undertaken, any prior <br /> history of violations, the degree of culpability, economic savings, if any,resulting from the violation,and <br /> other matters as justice may require." <br /> 17. Water Code Section 13268(b)(1) authorizes Administrative Civil Liability not exceeding one <br /> thousand dollars ($1,000) for each day of failure to submit technical reports as required by <br /> subdivision (b) of Section 13267. As of 7 December 2001, the Discharger has failed to submit the <br /> following: <br /> a. A report describing the installation of a meter to measure the flow of winery wastewater to the <br /> land application areas (due on 6 October 2000); <br /> b. A Groundwater Well Installation Workplan (due on 6 October 2000); <br /> c. An Operation and Wastewater Management Plan (due on 31 December 2000); <br /> d. A Groundwater Well Installation report (due on 6 January 2001); and <br /> e. Monthly Monitoring Reports have not been submitted on time and the three reports that were <br /> submitted were incomplete. The table below presents the status of the monitoring reports. <br /> Month Monitored Report Due Date Date Received Comments <br /> September, 2000 11/1/00 Not Received -- <br /> October, 2000 12/1/00 Not Received <br /> November, 2000 1/1/01 Not Received <br /> December, 2000 2/1/01 Not Received - <br /> January, 2001 3/1/01 4/11/01 Incomplete Report <br /> February, 2001 4/1/01 4/11/01 Incomplete Report <br /> March, 2001 5/1/01 4/11/01 Incomplete Report <br /> April, 2001 6/1/01 Not Received <br /> May, 2001 7/1/01 Not Received <br /> June, 2001 8/1/01 Not Received <br /> July, 2001 9/1/01 Not Received - <br />