My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
8751
>
2900 - Site Mitigation Program
>
PR0516580
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:47:36 PM
Creation date
5/8/2020 1:56:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0516580
PE
2965
FACILITY_ID
FA0012688
FACILITY_NAME
WILD ROSE VINEYARDS
STREET_NUMBER
8751
Direction
E
STREET_NAME
STATE ROUTE 12
City
VICTOR
Zip
95253
APN
05139005
CURRENT_STATUS
01
SITE_LOCATION
8751 E HWY 12
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> CENTRAL VALLEY REGION <br /> MONITORING AND REPORTING PROGRAM NO. <br /> FOR <br /> R. LAWSON ENTERPRISES <br /> dba WILDROSE VINEYARDS <br /> SAN JOAQUIN COUNTY <br /> This monitoring and reporting program (MRP)presents requirements for monitoring of the septic <br /> tanks, septic tank leachfields, winery wastewater effluent, and groundwater. This MRP is issued <br /> pursuant to Water Code Section 13267. The Discharger shall not implement any changes to this MRP <br /> unless and until a revised MRP is issued by the Executive Officer. Specific sample station locations <br /> shall be approved by Regional Board staff prior to implementation of sampling activities. <br /> All wastewater samples should be representative of the volume and nature of the discharge. The time, <br /> date, and location of each grab sample shall be recorded on the sample chain of custody form. <br /> SEPTIC TANK MONITORING <br /> Beginning 1 September 2000, septic tanks shall be inspected and pumped as described below. <br /> Inspections of sludge and scum depth are not required if the tanks are pumped at least annually. <br /> Inspection and <br /> Parameter Units Type of Measurement Reporting Frequency <br /> Sludge depth and scum thickness Feet Staff Gauge Annually <br /> in each compartment of each septic tank. <br /> Distance between bottom of scum Inches Staff gauge Annually <br /> layer and bottom of outlet device. <br /> Distance between top of sludge layer Inches Staff gauge Annually <br /> and bottom of outlet device. <br /> Septic tanks shall be pumped when any one of the following conditions exist or may occur before the <br /> next inspection: <br /> a. The combined thickness of sludge and scum exceeds one-third of the tank depth of the first <br /> compartment: or, <br /> b. The scum layer is within three inches of the outlet device; or, <br /> c. The sludge layer is within eight inches of the outlet device. <br /> LEACHFIELD/SEEPAGE PIT (DRYWELL) MONITORING <br /> The domestic wastewater systems will be visually monitored. Leachfield monitoring will consist of <br /> visual inspection of the leachfield and nearby area. The leachfield shall be inspected on a monthly <br /> basis for the presence of wet areas, leachate or groundwater seepage, objectionable odors, and/or <br /> unexpected plant growth. Leachfield monitoring results shall be included with all monthly monitoring <br /> reports. <br />
The URL can be used to link to this page
Your browser does not support the video tag.