Laserfiche WebLink
m�o�s�aaarrzau:s <br /> Mr. Christopher Cochrane <br /> California Regional Water Quality Control Board <br /> March 12, 2001 <br /> Page 3 <br /> ANTICIPATED SCHEDULE <br /> Geomatrix will initiate the scope of services within 2 weeks after receiving approval from the <br /> RWQCB and authorization to proceed from Dole. Field activities can be started within <br /> 2 weeks after receiving a drilling permit from the PHS/EHD, depending upon driller <br /> availability. Soil sampling is anticipated to take 1 day. Laboratory analyses will take 2 to 3 <br /> weeks to complete. A draft letter-report will be prepared for Dole's review and comment <br /> within 4 weeks after receiving the laboratory data. Within 1 week after receiving comments <br /> from Dole, the letter will be finalized for submittal to the RWQCB. <br /> Please call either of the undersigned if you have questions. <br /> Sincerely yours, <br /> GEOMATJtIX CONSULTANTS, INC. <br /> ,:::-74 112W-Z <br /> Howard D. Barlow,P.E., G.E. Paul C.Deutsch, CPSS <br /> Senior Geotechnical Engineer Principal Scientist <br /> L\PROJEC W08.000\doc=ent\Pond assessment workplan.doc <br /> Attachments: Figure 1 –Location Map <br /> Figure 2–Soil Sampling Location Plan <br /> Geomatrix Environmental Field Protocols <br /> cc: Ilene Miles, Dole Food Company, Inc. <br /> Roxann McKinstry, Dole Fresh Vegetables, Inc. <br /> bcc: Eileen M. Nottoli, Esq., Allen Matkins Leck Gamble &Mallory LLP <br /> Linda Ipong, Dole Fresh Vegetables, Inc. <br />