My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
8751
>
2900 - Site Mitigation Program
>
PR0516580
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:23 PM
Creation date
5/8/2020 1:57:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516580
PE
2965
FACILITY_ID
FA0012688
FACILITY_NAME
WILD ROSE VINEYARDS
STREET_NUMBER
8751
Direction
E
STREET_NAME
STATE ROUTE 12
City
VICTOR
Zip
95253
APN
05139005
CURRENT_STATUS
01
SITE_LOCATION
8751 E HWY 12
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m�o�s�aaarrzau:s <br /> Mr. Christopher Cochrane <br /> California Regional Water Quality Control Board <br /> March 12, 2001 <br /> Page 3 <br /> ANTICIPATED SCHEDULE <br /> Geomatrix will initiate the scope of services within 2 weeks after receiving approval from the <br /> RWQCB and authorization to proceed from Dole. Field activities can be started within <br /> 2 weeks after receiving a drilling permit from the PHS/EHD, depending upon driller <br /> availability. Soil sampling is anticipated to take 1 day. Laboratory analyses will take 2 to 3 <br /> weeks to complete. A draft letter-report will be prepared for Dole's review and comment <br /> within 4 weeks after receiving the laboratory data. Within 1 week after receiving comments <br /> from Dole, the letter will be finalized for submittal to the RWQCB. <br /> Please call either of the undersigned if you have questions. <br /> Sincerely yours, <br /> GEOMATJtIX CONSULTANTS, INC. <br /> ,:::-74 112W-Z <br /> Howard D. Barlow,P.E., G.E. Paul C.Deutsch, CPSS <br /> Senior Geotechnical Engineer Principal Scientist <br /> L\PROJEC W08.000\doc=ent\Pond assessment workplan.doc <br /> Attachments: Figure 1 –Location Map <br /> Figure 2–Soil Sampling Location Plan <br /> Geomatrix Environmental Field Protocols <br /> cc: Ilene Miles, Dole Food Company, Inc. <br /> Roxann McKinstry, Dole Fresh Vegetables, Inc. <br /> bcc: Eileen M. Nottoli, Esq., Allen Matkins Leck Gamble &Mallory LLP <br /> Linda Ipong, Dole Fresh Vegetables, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.