My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009360
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
10
>
2900 - Site Mitigation Program
>
PR0518209
>
ARCHIVED REPORTS_XR0009360
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 2:47:24 PM
Creation date
5/8/2020 2:30:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009360
RECORD_ID
PR0518209
PE
2950
FACILITY_ID
FA0013759
FACILITY_NAME
PACIFIC BELL
STREET_NUMBER
10
Direction
E
STREET_NAME
12TH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23336922
CURRENT_STATUS
02
SITE_LOCATION
10 E 12TH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.7 Wellhead Surveying <br /> On August 12, 2003, the elevations of the new monitoring wells were surveyed by Hunter <br /> Surveying of Orangevale, California to the nearest 0 01 foot and referenced to an established <br /> benchmark The resultant data will be used in the calculation of groundwater flow and gradient <br /> A copy of the field survey is included in Appendix D <br /> 3.8 Well Development <br /> On July 21, 2003, groundwater monitoring wells MW-1,MW-2, and MW-3 were developed by <br /> balling and surging at least 10 well casing volumes or until the well was dry, and until <br /> groundwater parameters, pH, specific conductivity, and temperature had stabilized Well <br /> development water was removed from the SBC facility and transported to Shaw's facility in <br /> Sacramento, California for storage pending off-site disposal Copies of the well development <br /> field logs are presented in Appendix E <br /> 4.0 Quarterly Activities <br /> The monitoring well purging and sampling methods were performed in general accordance with <br /> RWQCB and SJCEHD guidelines The new monitoring wells were measured and sampled on <br /> July 21, 2003 <br /> 4.1 Water Level Measurements <br /> Water level depths were measured in wells MW-1, MW-2, and MW-3 using an interface probe <br /> Depth to water measurements were referenced to designated measuring points at the top of each <br /> well casing <br />' 4.2 Monitoring Well Sampling <br /> Following well development, groundwater samples were collected from monitonng wells MW-1, <br />' MW-2, and MW-3 The groundwater samples were collected using new single-use, polyethylene <br /> bailers The water samples were transferred from the bailer into four 40-m1 VOA sample <br /> containers and a one-liter amber bottle supplied by the analytical laboratory Following <br /> collection, the sample containers were labeled, placed in a cooler with ice, and transported to the <br /> laboratory under chain of custody protocol The chain of custody record is included in <br /> Appendix C <br /> CNCIDl08-11-03l0 SHAAEMSTl03-0096 doe rJ <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.