Laserfiche WebLink
W � BORING NO. PB� INSB 2 <br /> r z <br /> ? z E (ADRILLING REMARKS () G: FIELD GEOLOGIST S, Alpsa DATE BEGAN 9119102 <br /> � x CHECKED BY R Dalnagra DATE FINISHED 9/19102 — <br /> �ai d APPROVED BY D Wynne SURFACE ELEV —49 ft mai <br /> • n en TOTAL DEPTH :J,� ft. CORE SIZE 2.5` dla. <br /> O LLAN CLAY; 55%day. 4ox _ <br /> an hard <br /> O 0 —Fines composition estimated by observation of eetNing rate within a <br /> vigorously shaken vial of water and sample soil <br /> 1 <br /> OO of <br /> 100x <br /> - 2 - <br /> 3 <br /> 3 Could not direct—push Pau gravel kept caving In Hydropunch to 16 begs 0 <br /> 00 gp <br /> PEA GR,4VEI- <br /> TOTAL DEPTH OF BORING 3.5 FEET <br /> 4 <br /> 5 <br /> 6 <br /> 7 <br /> 8 <br /> 9 <br /> 10 <br /> 11 <br /> 12 <br /> 13 <br /> -14- <br /> -15- <br /> 16 <br /> 41516 <br /> 17 <br /> DRILLER D Spearson PAGE 1 OF 1 <br /> DRILLING CO Gregg Drilling <br /> . DRILLING METHOD Hand Auger <br /> SAMPLING METHOD <br /> PROJECT Pacific Bell <br /> LOCATION Tracy, CA <br /> PROJECT NO 838819 06000000 <br /> DRAWN BY1 SCHAEFFER ICHECKED BY r_t st y° �v E& � <br /> DATE 10/17/02 APPROVED BY W Z DRAWING NO 839819^A14 Show <br />