Laserfiche WebLink
I 1 <br /> C A M B R I A <br /> ANTICIPATED FIRST QUARTER 2002 ACTIVITIES <br /> Groundwater Monitoring. Blaine will gauge and sample the site wells according to the existing <br /> sampling schedule and tabulate the data Cambria will prepare a groundwater monitoring report <br /> Groundwater Remediation: GWE will continue on a twice-monthly basis in well MW-lA only <br /> Onsite Abandoned Water Well- As previously proposed, Cambria would like to properly <br /> destroy the water well at this site We will schedule video logging of the well during the first <br /> quarter of 2002 We will advise SJCPHS of the date for video logging once it is scheduled <br /> CONCLUSIONS AND RECOMMENDATIONS <br /> MTBE concentrations this quarter are within the historical norm for this site, with the exception <br /> of BF-1, for which the MTBE concentration is significantly lower (690 ppb compared to 75,000 <br /> ppb in the third quarter 2001) Groundwater flow direction was to the northeast this quarter, as is <br /> typical for the site <br /> • CLOSING <br /> If you have any questions regarding the contents of this document, please call Joe Neely at <br /> (707)933-2361 <br /> Sincerely, <br /> Cambria Environmental Technology, Inc. <br /> Cynthia Vasko <br /> Staff Engineer <br /> R&D G,6 <br /> e N W <br /> Joe W Neely, RG p ��.c i1-► <br /> Senior Project Geologist <br /> RG 6927 No 6927 ° <br /> OF C.ALI�O� <br /> 0813 2 <br />