Laserfiche WebLink
CAMBRIA <br /> ANTICIPATED SECOND QUARTER 2009 ACTIVITIES <br /> Groundwater Monitoring Blaine will gauge and sample the site wells according to the existing <br /> sampling schedule and will tabulate the data Cambria will prepare a groundwater monitoring <br /> report <br /> Groundwater Remediation GWE will be performed twice a month starting in May 2001 <br /> Work Plan Cambria prepared a Site Investigation Work Plan and issued it on April 26, 2001 <br /> in response to SJCPHS's March 15, 2001 letter Once we receive work plan approval from <br /> SJCPHS we will obtain an encroachment permit for the proposed offsite wells and also submit <br /> drilling permit applications for the proposed wells <br /> CONCLUSIONS AND RECOMMENDATIONS <br /> The concentration of MTBE in the wells this quarter are within the historical norm for this <br /> site As mentioned above, we will continue GWE and we are increasing the frequency of <br /> GWE to twice a month <br /> CLOSING <br /> If you have any questions regarding the contents of this document, please call Joe Neely at <br /> (707) 933-2361 <br /> Sincerely, <br /> Cambria Environmental Technology, Inc <br /> Cynthia Vasko �c— <br /> Staff Engineer <br /> D GE <br /> W p�O <br /> NF Ci <br /> Joe W Neely, RG �� O' 1 sa <br /> Senior Project Geologist <br /> RG 6927 ° No 5927 ° <br /> OF <br /> 0813 2 <br />