Laserfiche WebLink
C A M B R I A <br /> ANTICIPATED SECOND QUARTER 2005 ACTIVITIES <br /> Cambria received verbal approval from Harlin Knoll on March 1, 2005 to discontinue <br /> groundwater sample collection from tank backfill well BF-1 Blaine will gauge and sample the <br /> other site wells according to the existing sampling schedule and tabulate the data Cambria will <br /> prepare a groundwater monitoring report <br /> CLOSING <br /> If you have any questions regarding the contents of this document, please call Joe Neely at <br /> (707) 933-2361 <br /> Sincerely, <br /> Cambria Environmental Technology, Inc. <br /> 1� <br /> Lisa Summers " <br /> • Staff Scientist <br /> 0 Al_ <br /> Joe W Neely, PG <br /> Senior Protect Geologist No. 6927 <br /> PG 6927 <br /> a <br /> Attachments <br /> Figure 1 Site Vicinity/Well Survey Map <br /> Figure 2 Groundwater Contour/Chenucal Concentration Map <br /> Appendix A Blaine Tech Services, Inc - Groundwater Monitoring Report <br /> Appendix B Groundwater Monitoring Data and Analytical Results - <br /> Chevron Service Station, 3775 Tracy Boulevard <br /> cc Mr Denis Brown, Shell <br /> Mr James Barton, Regional Water Quality Control Board <br /> Mr Bob Cochran, Chevron Products Company <br /> 0813 2 <br />