Laserfiche WebLink
�1 T <br /> CAM B R I A <br /> ANTICIPATED THIRD QUARTER 2003 ACTIVITIES <br /> Groundwater Monitoring- Blaine will gauge and sample the site wells according to the existing <br /> sampling schedule and tabulate the data Cambria will prepare a groundwater monitoring report <br /> Groundwater Remediation: Periodic GWE from wells MW-lA and BF-1 will continue on a <br /> monthly basis <br /> CONCLUSIONS AND RECOMMENDATIONS <br /> Well MW-lA contained MTBE at a concentration of 100 µg/L, which remains significantly <br /> reduced from historical MTBE concentrations in this well It appears that periodic GWE <br /> continues to reduce MTBE concentrations in well MW-1A Groundwater flow direction was to <br /> the northeast this quarter, as is typical for the site <br /> CLOSING <br /> If you have any questions regarding the contents of this document, please call Joe Neely at <br /> (707) 933-2361 <br /> Sincerely, <br /> Cambria Environmental Technology, Inc <br /> Anne Wettstone <br /> Staff Geologist <br /> 9 <br /> S,��ReD G1A" FO� <br /> ��` c,�'?H W tiFOCi <br /> Joe W Neely, RG O F `fes <br /> Senior Protect Geologist <br /> RG 6927 ° No 6927 ° <br /> OF <br /> • <br /> 0813 2 <br />