Laserfiche WebLink
nitoring System Certification <br /> ie Address: 85 E LOUISE AVE Date of Testing/Service: 08/25/2009 <br /> PTO N-71 <br /> F. In-Tank Gauging / SIR Equipment <br /> ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> Thi section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Con plete the following checklist: <br /> aYes ❑No Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> OYes ❑No Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Q Yes ❑No Was accuracy of system product level readings tested? <br /> ElYes ❑No Was accuracy of system water level readings tested? <br /> Fx1 Yes ❑No^ Were all probes reinstalled properly? <br /> OYes ❑No^ Were all items on the equipment manufacturers'maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> IT Yes ❑No ❑N/A (Check all that apply)Simulated leak rate: Q 3 g.p.h ❑0.1 g.p.h 00.2 g.p.h <br /> x Yes ❑No Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> F7]Yes ❑No Was the testing apparatus properly calibrated? <br /> ❑Yes ❑No ❑N/A For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑Yes ❑No• 0 N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑Yes ❑No' ❑x N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ❑Yes ❑No- 0 N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ❑Yes ❑No• ❑x N/A For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑Yes I❑No' Were all items on the equipment manufacturers'maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 Based on CA form dated 03/01 <br />