My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_2008 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 1:11:57 PM
Creation date
5/8/2020 3:44:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2011
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, California 95202-3029 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.sogov.or-q/ehd/unitiii.html <br /> CONTINUATION FORM Page: 3 of 3 <br /> OFFICIAL INSPECTION REPORT Date: 08/24/10 <br /> Facility Address: Arco Station #6080 85 E Louise Ave, Lathrop Program: J� <br /> SUMMARY OF VIOLATIONS <br /> CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> UST Inspection: Routine and Annual Monitoring System Certification <br /> 5. The monitoring and response plans on site are not current and not approved by the EHD. Monitoring <br /> Plan signed January 15, 2010 by Jennifer Marinas, PB Environmental Compliance Specialist, lists <br /> incorrect models for the leak sensors: annular space, piping sumps, under dispenser containment. No <br /> Red Jacket line leak detector onsite. The monitoring and response plans must be current and approved <br /> by the EHD. Complete and submit a copy of the monitoring and response plans for approval by the <br /> EHD by . An approved copy will be returned for your records. <br /> 19. The enunciator used as the audible/visual overfill prevention system is not currently functional on <br /> the all UST. Pressing the Reset button on the audible/visual system was not able to clear the alarm. Per <br /> technician, the relay was stuck. No parts had to be replaced or repaired. <br /> -All the ATGs were retested during the inspection. Passed the functionality test. <br /> Submit to SJC EHD within 30 days (09/24/10)- <br /> 1. one complete copy of the "Return to Compliance Certification" form <br /> 2. a written corrective action statement for the above violations <br /> 3. requested/ supporting documentations <br /> Notes: <br /> -Per Jamil, in October 2010, new dispenser and tank(s) (diesel), EVR upgrade phase II will be installed. <br /> -tri-annual Secondary Containment testing next due by 03/2011. <br /> - Certification of Financial Responsibility and financial assurance mechanism next due by 10/2010. <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE($122). <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Inspe or Received Title: �\ <br /> 1 ' <br /> EHD 23-02-003 Rev 08/10 CONTINUATION FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.