Laserfiche WebLink
D. Results of Testipg/Serkricing -'E T Dispatch <br /> Software Version Installed: eta <br /> Complete the following checklist:,- <br /> 3-yes <br /> hecklist:,-3'Yes O No* Is the audible alarm operational? <br /> ZY Yes ❑ No* is the visual alarm operational? <br /> O Yes ZI No* Were all sensors visually inspected,functionally tested.and confirmed operational? <br /> M'Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> O Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> Lei-N/A operational? <br /> Z'Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> O N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) Dump/Trench Sensors; ZMispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? Q—Yes; ❑No. <br /> O Yes lI No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> ❑ N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fillpoint(s)and operatingproperly? If so,at what percent of tank capacity does the alarm trigger? % <br /> Yes* O No Was any monitoring equipment replaced? If yes, identify specific sensors,probes, or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> O Yes* O'No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) O <br /> Product; ❑ Water. If yes,describe causes in Section E,below. <br /> O Yes O No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> O Yes ❑ No* Is all monitoring a jq mentoperational per manufacturer's s ecifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: -� J <br /> �Z a// Z AA 32.E ne,/ v r, <br /> Page 2 of 3 <br />