Laserfiche WebLink
i <br /> Monitoring System Certification , <br /> D. Results of Testing/Servicing . . _, « ..._ .., . ..,.�« �, •- .--. ,..�,..,.. .-. .. ._. .w <br /> Software Version Installed: <br /> Complete the following checklist: <br /> 51 Yes ❑ No* I Is the audible alarm operational? <br /> ,(fit Yes ❑ No* Is the visual alarm operational? <br /> 011 Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g, modem) <br /> Ik N/A operational? <br /> [ Yes ❑ No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ❑ NIA monitoring system detects a Ieak, fails to operate, or is electrically disconnected? If yes:which sensors initiate <br /> positive shut-down? (Check all that apply) ❑Sump/Trench Sensors; D Di penser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconne 'on? ❑Yes; ❑No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> (3 N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? If so,at what percent of tank capacity des the alarm trigger? % <br /> l� Yes* ❑ No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> Cl Yes* No Was liquid found inside any secondary containment systems designed as Cinr systems? (Check all that apply) <br /> ❑Product; ❑ Water. If yes,describe causes in Section E,below. <br /> Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe howl and when these deficiencies were or will be corrected. <br /> E. Comments: kie coal 0,9 STP SvM,o Serx5o,- ode.! 1� 71IL13.70 -3-2 2_ <br /> ICj S ertg 1 !002 9 '.5 .New ser.,r, x .28 3 Lj Ai <br /> _ T-6-1 r InOLI5�n.s�f-- r ;�c� �'s the— j'c( S7-P <br /> Pale 2 of 03/01 <br />