My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_2004 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 11:54:19 AM
Creation date
5/8/2020 4:22:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2007
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19255517888 Main Fax GETTLER RYAN INC 0' `09 a.m 01-12-2007 7!11 <br /> r 77 / <br /> • S7--4q <br /> F. In-Tank Gauging/SIR Equipment: heck this box if tank gauging is used only for inventory control. <br /> O Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Compiete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and ,' c uding testing for ground faults? <br /> ❑ yes ❑ No' were all tank gauging probes visually i e and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of��water <br /> I readings tested? <br /> D Yes ❑ No* was acts level readings tested? <br /> D Yes ❑ No" all probes reinstalled properly? <br /> D Yes No• Were all items on the equipment manufacturer's maintenance checklist completed? <br /> o the Section H,below,describe how snd when these deficiencies were or wiN be corrected. <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed <br /> Complete the following checklist: <br /> D Yes Q No" For equipment start-up or annual oquip Tient certification, was a leak simulated to v performance? <br /> O N/A (Check all that apply) simulated leak rate: 0 3 g p.h.; ❑O.i g p.h; D 0.2 g.p. <br /> ❑ Yes O Now Were all LLDs confirmed operational and accurate within ts? <br /> D Yes ❑ No" Was the testing apparatus properly cahbrawO <br /> ❑ Yes ❑ No" For mechanical LLDs,does the LLD restrict clow if it detects a leak? <br /> D N/A <br /> U Yes O No* For electronic LLDs,does the a automatically shut off if the LLD detects a leak? <br /> L) NIA <br /> ❑ Yes !] No" For electronic LL the turbine automatically shut o8 if any portion of the monitoring system is disabled <br /> D NIA or discorrn <br /> Cl Yes ❑ No' For SjKt=k LLDs, docs the turbine automatically shut off if any portion of the monitoring system <br /> D N/Abnctions or fails a list? • <br /> D Yes C1 [!F!Vrelectronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A <br /> es D No" Were all items on the equipment manufacturer's maintmaance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> FL Comments: <br /> Page 3 of 3 tulot <br />
The URL can be used to link to this page
Your browser does not support the video tag.