My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008380 (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
110
>
2900 - Site Mitigation Program
>
PR0009005
>
ARCHIVED REPORTS_XR0008380 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 12:02:17 PM
Creation date
5/11/2020 11:22:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008380
RECORD_ID
PR0009005
PE
2953
FACILITY_ID
FA0004053
FACILITY_NAME
LUSTRE-CAL NAME PLATE CO
STREET_NUMBER
110
Direction
E
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04124048
CURRENT_STATUS
01
SITE_LOCATION
110 E TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V Z1 INC <br /> • APPENDIX lil <br /> SOIL PROTOCOL <br /> Sol! Sampling with Drill Rig <br /> A two inch diameter split spoon sampler flitted with three six inch brass sample tubes will <br /> be used to collect samples In each borehole, samples will be collected at five foot <br /> intervals After drilling to each sampling depth, the sampling apparatus will be inserted <br /> into the hollow auger and driven into the undisturbed sod beneath the borehole <br /> Upon recovery, the lower two sample tubes, designated A and B, will be sealed by <br /> i <br /> covering with aluminum foil, capping with plastic and sealing with cloth tape This sample <br /> recovery method minimizes head space in the sample tubes The samples will then be <br /> stored on ice pending delivery to a certified laboratory for chemical analysis and <br /> • accompanied by appropriate Chain of Custody documents The material in the third tube <br /> and in the sample "shoe" will be examined and described, then discarded Sample <br /> descriptions will include lithology, moisture content, fossil content, and odor Samples <br /> will also be checked with an Organic Vapor Meter (OVM) Lithologic logs for each <br /> borehole will be compiled utilizing the sample descriptions <br /> The sampler will be washed with a non-phosphate cleaner and double rinsed with water <br /> after each use Auger flights will be steam cleaned after drilling each borehole This will <br /> assure that contamination is not transferred to other boreholes The cleaning will take <br /> place on established cleaning sites and the effluent will be contained <br /> Uncontaminated boreholes as determined b OVM filed tests will be backfilled with the <br /> U ( y ) <br /> same material or cuttings extracted from the hole during drilling after placing five feet of <br /> bentonite in the bottom of the hole Boreholes found to have contaminated soil will be <br /> backfilled with a cement and sand slurry containing no more than five percent bentonite <br /> Appendix III <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.