Laserfiche WebLink
■7L1 INC <br /> . F. Trenching and Excavation Safety Procedures <br /> G. Decontamination <br /> Personnel <br /> Personnel will wear Tyvek garments and gloves These will be disposed of on-site <br /> Equipment <br /> • <br /> 1 Wash down on-site and rinse with clean water <br /> H. Procedures for Disposal of Wastes and Derived Materials <br /> 1 All waste water and soil will be placed on contaminated soil pile and covered <br /> I. Site Safety Meetincts <br /> Before beginning site work the SSO shall conduct a site safety meeting to discuss the <br /> following <br /> the tasks to be performed, <br /> • <br /> Appendix II <br /> Page 15 <br />