My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008380
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
110
>
2900 - Site Mitigation Program
>
PR0009005
>
ARCHIVED REPORTS_XR0008380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 11:36:35 AM
Creation date
5/11/2020 11:23:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008380
RECORD_ID
PR0009005
PE
2953
FACILITY_ID
FA0004053
FACILITY_NAME
LUSTRE-CAL NAME PLATE CO
STREET_NUMBER
110
Direction
E
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04124048
CURRENT_STATUS
01
SITE_LOCATION
110 E TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3/qy <br /> .w/ <br /> ■ Z1 INC <br /> lll. REMEDIAL ACTION TASKS DESCRIPTION <br /> • <br /> Task 1- Site Preparation <br /> A 10 ml reinforced polyethylene sheet will be spread on the ground at the location of the <br /> landfarm stockpile and six inches of clean, sandy soil will be spread over this sheet to act <br /> as a base and to prevent damage to the visqueen It is anticipated the landfarm stockpile <br /> site will be located where hydrocarbon impacted soil is currently stockpiled (Exhibit 2) <br /> Additional excavated hydrocarbon impacted soil will then be placed on the stockpile A <br /> berm will be constructed surrounding the bioremediation site to prevent uncontrolled <br /> runoff from rainfall and unauthorized vehicle traffic <br /> Underground utilities and other subsurface lines will be identified by metal or pipe <br /> detector and direct investigation techniques (exposure by digging) to minimize dig-in <br /> damage during soil excavation <br /> • Task 2- Soil Excavation, Sampling and Stockpiling <br /> An excavator with a 4-cubic yard bucket will be used to selectively excavate the <br /> hydrocarbon impacted soil immediately adjacent to the concrete tank to a depth of about <br /> 20 feet or to the base of impacted soil Impacted soil surrounding the tank left in place <br /> because of the proximity of the brick building is estimated to be 50 cubic yards or less <br /> However, direct inspection of the impacted soil will allow detailed inspection and sampling <br /> (Exhibits 5 to 7) Undisturbed soil samples will be collected from the sidewalls and floor <br /> of the excavation at the rate of one sample per 20 lineal feet or as appropriate under the <br /> direction of local SJCLHD personnel These samples will be taken in accordance with the <br /> sampling protocol outlined in Appendix V Samples will be analyzed for BTEX, TPH-G, <br /> and TPH-D A hand auger will be used to drill horizontal or inclined borings to obtain soil <br /> samples from this remaining impacted soil in order to characterize it A map showing soil <br /> that is anticipated to be removed is depicted in Exhibit 8 <br /> The excavation will be backfilled using clean pea-gravel or sand that will compact to <br /> Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.