My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TULLY
>
17725
>
2900 - Site Mitigation Program
>
PR0526486
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 4:22:25 PM
Creation date
5/11/2020 11:39:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0526486
PE
2965
FACILITY_ID
FA0017927
FACILITY_NAME
LOCKEFORD COMMUNITY SVCS DIST
STREET_NUMBER
17725
Direction
N
STREET_NAME
TULLY
STREET_TYPE
RD
City
LOCKEFORD
Zip
95237
APN
05303039
CURRENT_STATUS
01
SITE_LOCATION
17725 N TULLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Initial Backfill <br /> 1. Initial backfill shall be the material placed on the <br /> bedding after pipe joints have been completed , <br /> inspected , and passed by the Engineer , and shall extend <br /> to a point six (6) inches above the top of the pipe. <br /> 2. The material shall be carefully placed in lifts not to <br /> exceed six ( 6) inches in height, brought up evenly on <br /> both sides, so as to completely fill all spaces under <br /> the haunches , and compacted to 92% , all done so as not <br /> to disturb or damage the pipe . Jetting will not be <br /> allowed. <br /> C. Top Backfill <br /> 1. Top backfill shall be the original top soil and shall be <br /> compacted to a density of not less than 90 percent. <br /> D. Backfill in Compacted Fill <br /> 1. Where trenches have been excavated in compacted fill, <br /> these trenches shall be backfilled with the fill <br /> material excavated , and recompacted, in 6 inch layers, <br /> to 95% relative density by a means other then jetting. <br /> E. Trench Backfill Compaction <br /> 1. When mechanical means are used to obtain the required <br /> compaction, Contractor must exercise extreme caution so <br /> as not to damage or disturb the pipe . This is <br /> particularly true when compacting directly over top of <br /> pipe in the placing of initial backfill. <br /> F. Other Backfill Requirements <br /> 1. Where cribbing is allowed in the trench, the fill shall <br /> be carried to a height sufficient to prevent the <br /> surrounding ground from cracking or caving into the <br /> trench before the cribbing is removed. <br /> 3 . 08 GRADING <br /> A. Grading shall be performed at such places as are indicated <br /> on the Drawings, to the lines, grades, and elevations shown <br /> and shall be made in such a manner that the requirements for <br /> formation of embankment can be followed . All unacceptable <br /> material encountered , of whatever nature within the limits <br /> of grading , shall be removed and disposed of as directed. <br /> During the process of excavation , the grade shall be <br /> maintained in such condition that it will be well drained at <br /> EARTHWORK <br /> 02200-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.