My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999 - 2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_1999 - 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 4:48:51 PM
Creation date
5/11/2020 12:05:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999 - 2003
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Address: SS#6080, 85 E Louise Avenue,Lathrop Date of .esting/Servicing: )q-03 <br /> F. In-Tank Gauging / SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br /> jr-C—heck this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com lete the o o ing checklist: <br /> V ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ No* Was accuracy of system product level readings tested? <br /> ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes O No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> COm tete the o ing checklist: <br /> Yes ElNo* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: BT-g—p.h.1; ❑ 0.1 g.p.h.2; ❑0.2 g.p.h.2 <br /> Notes: 1. Required for equipment start-up certification and annual certification. <br /> 2. Unless mandated by local agency,certification required only for electronic LLD start-up. <br /> Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> []'Yes ❑ No* Was the testing apparatus properly calibrated? <br /> C;� I'es ❑ No* For mechanical LLDs,does the LLD restrict product now if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> ❑- to <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> [�N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> p--N/A or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> 2--5/-A <br /> Yes El No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.