My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986 - 1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_1986 - 1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 4:39:27 PM
Creation date
5/11/2020 1:53:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 1998
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Idams <br /> recision <br /> nstrumentation, Co. <br /> 3031 TISH WAY,SUITE 200•SAN JOSE,CALIFORNIA 95128 <br /> (408) 244-6739• FAX(408)244-6801 <br /> ARCO Products Company <br /> API/Ronan X76S Leak Detection Certification <br /> Facility # Date <br /> Address <br /> Ir ' <br /> I Verify Intrinsic Safety <br /> Proper field wire termination <br /> Proper power wiring with earth ground and individual breaker <br /> Complete isolation of I.S. field wiring from any other wiring <br /> especially in gutters <br /> Proper use of E.Y.S. fittings <br /> II_ Check for proper panel installation <br /> Panel mounted in a nonhazardous location <br /> Panel is accesible to station operators <br /> All field wiring is Labelled at terminal strip or adjacent gutter <br /> All wiring to panel is brought through appropriate punch-outs <br /> III Check for proper probe installation <br /> Piping sump sensors suspended within one inch of sump bottom <br /> Double walled FRP tank sensors(LS-7 ) installed at bottom of tank <br /> with a pull wire circumventing the primary tank and accessible <br /> from grade. <br /> Annular space risers should be sealed watertight with field <br /> wiring. penetrating using cable grips or other apprpriate method <br /> Probe leads terminating in a watertight J-box <br /> IV Check system operation <br /> Verify proper fuctioning of alarm horn and lights by pushing <br /> the test button <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.