Laserfiche WebLink
r f <br /> Raychem <br /> Adrienne Klopack Raychem Corporation <br /> Regional Sales Manager TraceTek' Products Group <br /> 300 Constitution. L)rivc <br /> Menlo Park U 9.025-1764 <br /> 4151361 6209 <br /> SAX 41S1367 3rv-4' <br /> 'lracctekK Nultiple-channel Alam System <br /> .Facility # Datc <br /> Address <br /> I Verify I[,t_ insic Safety <br /> Proper field wire termination <br /> i Proper power wiring with earth ground and individual breaker <br /> Complete isolation of I.S. field wiring from any other wiring <br /> especially in gutters <br /> Proper use of E.Y.S. fittings <br /> I1. Cheer for proper pane? installation <br /> Panel mounted in a nonhazardous location <br /> Panel is accesible to station operators <br /> All field wiring is labelled at terminal strip or adjacent gutter <br /> I <br /> ' All wiring to panel is brought through appropriate punch-outs <br /> III Check for proper probe installation <br /> Piping sump sensors suspended within one inch of sump bottom <br /> ' Double walled FRP tank sensors(LS-7) installed at bottom of tank <br /> with a pull wire circumventing the primary tank and accessible <br /> i <br /> from grade. <br /> I Annular space risers should be sealed watertight with field <br /> wiring penetrating using cable grips or other apprpriate method <br /> Probe leads terminating in a watertight .7-box <br /> IV Check system operation <br /> _Verify proper fuctioning of alarm horn and lights by pushing <br /> the test button <br /> R <br />