My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
INSTALL_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 4:43:08 PM
Creation date
5/11/2020 2:26:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2011
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tank Installation Checklist <br /> CONTAINMENT <br /> SOLUTIONS For Fiberglass Underground Tanks <br /> Complete this checklist and keep it with copies of any written authorizations for variations and/or deviations received from CSI. <br /> Site Owner Date of Installation <br /> Site Address <br /> Street City State Zip <br /> Installing Contractor <br /> Company Street City State Zip <br /> Completed N/A <br /> 1. Installation backfill material meets CSI specification(sieve analysis is attached). <br /> Indicate which material you used: ❑ Pea Gravel <br /> ❑ Crushed Stone <br /> ❑ Other(CSI approval letter attached) <br /> 2. Backfill above tank top. <br /> Indicate which material you used: ❑ Same backfill material as#1 above <br /> ❑ Geotextile and alternative material above tank top <br /> 3. Excavation and tank clearance meet requirements of Section E. <br /> 4. Geotextile used to tine excavation: ❑ Yes ❑ No <br /> 5. Indicate hole condition: <br /> ❑ Dry hole (Water is not anticipated to reach tank—area is not subject to flooding) <br /> ❑ Wet hole(Excavation may trap water—area is subject to flooding) <br /> 6. Anchoring performed in accordance with installation instructions: <br /> Indicate which method you used ❑ Deadmen <br /> ❑ Anchor Pad <br /> ❑ No mechanical anchoring <br /> 7. Depth of backfill under tank inches <br /> 8. All deflection measurements are recorded on reverse side. <br /> 9. Backfill placed in 12"lifts 8.probed as described in Section I. <br /> 10. Tanks ballasted according to Section I. <br /> 11. Tank burial depth complies with the requirements of Section G. <br /> 12. Piping and bottom sump clearances according to Section K. <br /> Installation was in accordance with Tank Installation Instructions(INST.6001). <br /> Owner Representative(Print Name) Date Contractor Representative(Print Name) Date <br /> Owner Representative(Signature) Date Contractor Representative(Signature) Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.