My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
INSTALL_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 4:43:08 PM
Creation date
5/11/2020 2:26:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2011
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF • <br /> Preliminary Instructions......................................................3 Wet Hole ..........................................................14 <br /> Safety Considerations..................................a....................3 Bedding ......................................................14 . <br /> Reminders ......................................................................3 Ballast.........................................................14 <br /> Activation of Tank Warranty................................................3 Backfill ............. ........14 <br /> ................................... <br /> Important Telephone Numbers...........................................3 A9. Piping and Sump Clearances ..........................15 <br /> Tank with Bottom Sumps .................................15 <br /> A. All Single-wall and Double-Wall Tanks...............415 External Piping.................................................15 <br /> Al. Handling/Preparation .........................................4 Internal Piping <br /> LiftingTanks.......................................................4 A10. Filling................................................................15 <br /> A2. Bed and Backfill.................................................4 A11. Venting.............................................................15 <br /> A3. Pre-installation Testing.......................................5 Al2. Manway and Manway Extensions....................15 <br /> Pressure.............................................................5 A13. Special Instructions for Compartment Tanks .....16 <br /> Visual Air-Soap Test...........................................5 A14. Site Monitoring Wells .......................................16 <br /> Single-Wall Tanks...............................................5 B. Double-Wall Tank Monitoring Systems..................17 <br /> Double-Wall Tanks with Dry Annular Space.......5 B1. Types of Tank Monitoring Systems ..................17 <br /> Outer Wall Test .............................................6 B2. Installsition of Liquid or Vapor Sensor..............17 <br /> Inner Wall Test ..............................................6 B3. Installation of Vacuum or Air Pressure Monitoring <br /> Double-Wall Tanks Hydrostatically Monitored System.............................................................17 <br /> Reservoir Level Check..................................6 B4. Installation of Hydrostatic Tank Monitor...........17 <br /> Outer Wall Test .............................................6 C. Hydrostatic Monitoring ...........................................18 <br /> Inner Wall Test ..............................................6 C1. Preparation ......................................................18 <br /> A4. Hole Size............................................................7 C2. Jobsite Safety Precautions ..............................18 <br /> Stable Excavations.............................................7 C3. Reservoir Fluid Height Adjustment..................18 <br /> Unstable Excavation ..........................................8 C4. Reservoir Alarm Actions ..................................18 <br /> A5. Burial Depth and Cover......................................8 D. Collars and Turbine Enclosures ....................... 19-23 <br /> ExcavationDepth...............................................8 D1. General............................................................19 <br /> Traffic Pad Reinforcement..................................8 Containment Collar..........................................19 <br /> Pad Dimensions.................................................8 Turbine Enclosure............................................19 <br /> Maximum Burial Depth ......................................8 Handling...........................................................19 <br /> A6. Filter Fabric Installation......................................9 Inspection ........................................................19 <br /> Dry Hole.............................................................9 D2. Turbine Enclosure Height.................................19 <br /> WetHole............................................................9 D3. Top Clearances................................................20 <br /> A7. Anchoring..................................................... 9-12 D4. Mounting Turbine Enclosure to Collar..............20 <br /> Mechanical Anchoring .....................................10 D5. FRP Sealed Turbine Enclosure........................22 <br /> Concrete Anchor Pad.......................................11 D6. FRP Watertight Turbine Enclosure...................22 <br /> Deadman Anchors...........................................11 D7. FRP Nonsealed Turbine Enclosure..................23 <br /> Single-Tank Installation...............................11 D8. Hydrostatic Water Test.....................................23 <br /> Multiple-Tank Installation............................12 Joints................................................................23 <br /> AnchoringHardware........................................12 Seals................................................................23 <br /> Optional Man-out-of-hole Method....................12 D9. Monitoring........................................................23 <br /> A8.Tank Installation.........................................................13 D10. Periodic Testing................................................23 <br /> Dry Hole(with OSHA sloped excavation walls)13 E. Field-installed Fittings for Piping and Electrical <br /> Bedding .....................................................13 Conduit ..............................................................24-26 <br /> Backfill ........................................................13 E1. FR ng Installation...............24 <br /> D Hole(straight or shored walls E2. Secondary Piping Connection .........................25 <br /> Dry ( 9 ) ..................13 ry P� 9 <br /> Backfill .......... . . ........................13 E3. Electrical Coupling Installation.........................26 <br /> Probe..........................................................13 F. Manway Risers.........................................................27 <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.