My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
INSTALL_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 4:43:08 PM
Creation date
5/11/2020 2:26:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2011
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION A — All Single • Double <br /> For All Tests: REMOVE AIR SUPPLY <br /> DO Step 1 <br /> ♦ Install air gauge at the fitting where the air pressure Close the air supply valve to the primary tank. <br /> hoses connected to the primary tank. Step 2 <br /> ♦ Install a second gauge in some other primary tank fit- <br /> Disconnect the air supply (see figure 4). <br /> ting to use as a check against the first primary tank PRESSURIZE ANNULAR SPACE <br /> gauge to insure that the tank is not over pressurized. <br /> Step 1 <br /> ♦ Install a third gauge connected to the annular space Open the manifold valve in order to pressurize the tank <br /> at thE manifold assembly annular space (see figure 4). <br /> ♦ Use a maximum 15 psi air gauge with 1/4 or 1/2 Ib. Step 2 <br /> increments. Pressure in primary tank may drop slightly. <br /> FIGURE 4 <br /> ♦ A contractor supplied pressure relief valve must be con- <br /> nected to the primary tank for additional protection.The Air supply To air supply Manifold <br /> relief valve should be sized and set to prevent the tank valve closed <br /> (disconnected) valve open <br /> from ein pressurized in excess of the maximum al- gauge <br /> g p Air gauge <br /> lowe test pressure. <br /> DO NOT <br /> ♦ Lift or hoist a tank under pressure.This could result in ystem <br /> h tank) <br /> personalinjury. <br /> Annular space fitting or Reservoir <br /> 11 VISUAL AIR/SOAP TEST <br /> DO NOT Connect the air supply directly to the an- <br /> nular space monitoring fitting or tank damage will Monitor the pressure readings for at least 30 minutes. <br /> result. <br /> Outer Wall Test Step 2 <br /> At the same time, cover tank outer surface with soap <br /> PRESSURIZING TANK solution (see Visual Air/Soap Test). <br /> Step 1 Step 3 <br /> Clos manifold valve between primary tank and Carefully inspect for leaks as indicated by bubbles. <br /> annular space (see figure 3). Inner Wall Test <br /> Step 2 Ste 1 <br /> Pressurize primary tank to 5 psi maximum. Close manifold valve to annular space. <br /> Step 3 Step 2 <br /> Use pressure relief valve. Open air supply valve to vent primary tank. <br /> Step 3 <br /> Maintain 5 psi pressure on the annular space. <br /> Do not connect the air supply directly to the Step 4 <br /> annular space monitoring fitting or tank damage Monitor air gauge on tank for another 30 minutes, but <br /> not more than 60 minutes. <br /> will result. <br /> After successfully completing air test: <br /> FIGURE 3 Step 1 <br /> Manifold Release pressure. <br /> Air supply to air supply valve <br /> valve open Step ep 2 <br /> Air gau e Disconnect and remove air manifold fittings, hose and <br /> Air gauge valve. <br /> Manifold system <br /> (supplied with tank) <br /> Annular space fitting or Reservoir <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.