My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
INSTALL_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 4:43:08 PM
Creation date
5/11/2020 2:26:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2011
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION . • Double Wall Tanks <br /> ♦ 4' through 10' diameter tanks require: Pad Dimension <br /> ♦ 4' through 10' diameter tanks require: ♦ Paving at grade must extend at least 12" beyond tank <br /> ❑ Minimum of 18" (24" preferred) between adjacent perimeter in all directions (see figure 7). <br /> tanks. <br /> FIGURE 7 <br /> ❑ Minimum of 18"(24"preferred)between tank sides/ <br /> ends and the walls of the excavation. r—A -� A-12 -A- <br /> Minimum <br /> ♦ 12' diameter tanks require: n ' <br /> Ll 24" between adjacent tanks. ; z'Ma m mu <br /> U 24" between tanks sides/ends, and the walls of <br /> the excavation (see figure 5). <br /> UNSTABLE EXCAVATIONS (FIGURE s) <br /> A <br /> 18•Minimum <br /> 24•Preferred <br /> -112A-, -A- -112-- Maximum Burial Depth <br /> Tank Tank ' ♦ <br /> Diia. UL requirements specify that the depth of cover must <br /> a. D <br /> 2a•Reqaired not exceed 7' (see figure 7). <br /> on 12'Tank ❑ For all size tanks. <br /> 1;2 Tank Dia, 1/2 Tank Dia. 112 Tank Dia. ❑ For both traffic and no traffic conditions. <br /> s <br /> =` — ♦ For deeper burial depths, contact Tank Technical <br /> ♦ Muck, bog, peat, swamp or landfill type areas where Support. <br /> the soil is soft or in areas with expansive clay soils. <br /> or have less than 750 lbs./sq. ft. cohesion per ASTM Minimum Burial Depth NoTraffic Load and No Mechani- <br /> D2166 (Test Methods for Unconfined Compressive cal Anchoring <br /> (4'-10'diameter tanks) <br /> Strength of Cohesive Soil), <br /> or have ultimate bearing capacity less than 3500 lbs./ NOTE: When mechanical anchoring is required,refer <br /> sq. ft. to chart (section A7)for minimum burial depths (see <br /> ♦ In unstable excavation, tanks require: figure 8). <br /> ❑ Minimum 18" (24" preferred) between adjacent FIGURE 8 <br /> tanks. (24" required for 12' diameter tanks). <br /> ❑ Minimum of 1/2 the tank diameter from ends <br /> and sides of tanks to excavation walls (see fig- LA <br /> 12"Backfill a .ure 6). a"Reinfor Concrete♦ May require a reinforced concrete pad under tank. <br /> ♦ Contact soils consultant for recommendations. <br /> ♦ Filter fabric hole liner is recommended for soils (see 12"Beddin <br /> "Filter Fabric"section for list and further requirements): <br /> ❑ With less than 250 lbs./sq.ft.cohesion or, <br /> ♦ Tanks need a minimum cover of 24" backfill OR 12" of <br /> ❑ With ultimate bearing capacity of less than 500 lbs./ backfill plus 4" reinforced concrete (see figure 8). <br /> ♦ Local codes may require deeper minimum burial depth. <br /> AS. B RIAL DEPTH AND COVER (12' diameter tanks) <br /> Excavation Depth ♦ Tanks need a minimum cover of 42" backfill OR 38" <br /> ♦ All tank holes must be deep enough to: backfill plus 4" reinforced concrete. <br /> ❑ Allow a minimum of 12" and a maximum of 24" Minimum Burial Depth H-20 Traffic Loads and No Me- <br /> required backfill bed over the hole bottom or con- chanical Anchoring <br /> crete pad. (4' - 10' diameter tanks) <br /> Traffic Pad Reinforcement NOTE: When mechanical anchoring is required,refer <br /> ♦ The reinforcements in the concrete traffic slab must be to chart(section A7)for minimum burial depths. <br /> properly sized for job conditions and traffic loads to as- <br /> sure concrete surface pad integrity. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.