My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
INSTALL_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 4:43:08 PM
Creation date
5/11/2020 2:26:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2011
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Collars • Turbine Enclosures <br /> COLLARS AND TURBINE ENCLOSURES ♦ Watertight FRP turbine enclosure. <br /> Designed to prevent water infiltration under most <br /> , conditions. <br /> • Requires an adhesive joint at the collar and where <br /> / reducer meets the turbine pipe body. <br /> • Lid is pressed on to compress o-ring gasket in <br /> groove at top of reducer. <br /> ASPHYXIATION FIRE EXPLOSION ♦ Sealed FRP turbine enclosure. <br /> To prevent fire or explosion hazard, Containment Solu- • Designed to be waterproof <br /> tions recommends air driven tools whenever possible. Do <br /> Not use electrical power tools where flammable vapors • Requires an adhesive joint at the collar and where <br /> or liquids exist. Also,when electric hand tools are used, reducer meets the turbine pipe body <br /> be aware of potential shock hazards. Wear protective • Lid is bolted onto flanged top with flat gasket. <br /> clothing and eye protection. <br /> Turbine enclosure or containment collar may be a con- HANDLING <br /> fined space. Follow proper safety procedures. ♦ Wear gloves. <br /> Di. GENERAL ♦ Do not roll or drop. <br /> CONTAINMENT COLLAR ♦ Set on smooth ground. <br /> Important:If high winds are anticipated,the contractor <br /> Intended use: Is responsible for tying down the turbine enclosure to <br /> ♦ Must be continuously monitored for piping leaks using prevent damage from being moved by high winds. <br /> an electronic leak monitoring sensor. INSPECTION <br /> ♦ Termination point for secondary piping systems. <br /> Before installation: <br /> ♦ Provide containment of spilled liquids from a submers- ♦ Visually inspect the turbine enclosure components for <br /> ible pump. shipping damage. <br /> ♦ If damage is found, contact Containment Solutions <br /> A U T 1'0 N Field Service. <br /> In freezing conditions, protect collar from water accu- Secondary pipe fittings(see Section Ell): <br /> mulatlon. Freezing water may cause freeze damage. ♦ Containment Solutions supplies an alternate two piece <br /> FRP coupling which can be field installed to provide a <br /> TURBINE ENCLOSURE watertight piping connection. <br /> Intended use: ♦ Containment Solutions also provides an alternate <br /> ♦ Separate turbine from corrosive soils. Environ Coupling. <br /> Electrical conduit fittings (see Section E3): <br /> ♦ Prevent ingress of groundwater when sealed to con- ♦ Containment Solutions supplies an alternate two piece <br /> tainment collar with optional adhesive kit. steel coupling which can be field installed to provide a <br /> ♦ Provide housing for a submersible pump. watertight piping connection. <br /> ♦ Provide termination point for double-wall piping system. ♦ Containment Solutions also provides an alternate <br /> Environ Coupling. <br /> After completing all piping and wiring connections, <br /> place the top over the turbine enclosure. D2. TURBINE ENCLOSURE HEIGHT <br /> ♦ Non-sealed FRP turbine enclosure. Before installing the turbine enclosure: <br /> ♦ <br /> • Top g designed to prevent water run off from en- Measure length to be sure it is long enough. (See <br /> Section D3 for required top clearances and Sections <br /> tering turbine enclosure. D5-D7 for turbine dimensions.) <br /> • if water rises to the non-sealed joint, water will <br /> infiltrate the turbine enclosure and cause alarm <br /> to activate. CONTINUED ON PAGE 20 <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.