My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
INSTALL_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 4:43:08 PM
Creation date
5/11/2020 2:26:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2011
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Veeder-Roof Line Leak Application Guide <br /> Special Installations <br /> Manifolded Line Applications <br /> PLLD and WPLLD leak detection systems can handle product lines supplied by multiple tanks and pumps,to a maximum of 8 <br /> tanks and pumps per product line. <br /> Standard line leak sensing and check valve equipment should be installed at the primary pump. <br /> To perform 0.2 and 0.1 gph tests, a non-vented SwiftCheck valve(P/N 330020-416), or new Red Jacket 65 psi relief valve(P/N <br /> 410153-002),or SpikeCheck Valve Non-PSI Relief Valve for Standard Pump(P/N 410557-002), or FE Petro 65 psi Relief Check <br /> Valve(FE P/N 402459931)should be installed on each of the other pumps supporting the manifolded product line.The Non- <br /> Vented SwiftCheck Valve is rated to a maximum 70 gpm. <br /> NOTE: For 5 HP Maxxum pumps in diesel,an addtional in-line check valve with no pressure relief should be installed <br /> • on the`Slave'pump to prevent backflow. <br /> A relay on a Four-Relay module or 1/0 Combination module(TLS-350)or 1/0 Module(TLS-450) must be available to control <br /> each secondary pump.The standard line leak modules will provide pump control output for the primary pump and the"Pump In" <br /> signal for the set. <br /> A typical manifolded line installation for PLLD is shown below: <br /> To Dispensers <br /> Flexible Pipe with <br /> Flexible Pipe with <br /> Swivel or Union Swivel or Union <br /> Ball Valve Ball Valve Non-Vented <br /> PLLD Sensor/ SwiftCheck <br /> SwiftCheck Valve Valve(if req'd.) <br /> Assembly <br /> B <br /> 1320 <br /> . <br /> a • <br /> ❑ ❑ <br /> Warning Tag Master Pump Slave Pump <br /> p11tl\rnfd1anks.eps Lower Numbered Tank Higher Numbered Tank <br /> Transducer Installation - Red Jacket CPT and Quantum CPT Pumps <br /> This installation procedure is to be used with Red Jacket CPT and Quantum CPT Pumps. <br /> 1. Install the Red Jacket CPT Transducer Adapter Kit(Red Jacket part number 144-326-5)following the instructions with the <br /> kit.Thread the PLLD transducer in the mechanical LLD port of the pump. <br /> QIMPORTANT!Seal any pipe threads using a UL-classified,nontoxic pipe sealant suitable for the fuel involved. <br /> • The figure below illustrates two PLLD transducer installations in Red Jacket CPT pumps-consult"Check Valve Require- <br /> ments"on page 5,to determine what check valve you will need to install to perform your intended level of testing. <br /> 2. Verify that the TLS-350 Console has Version x19 or later(TLS-450 has Version 1 or later)software. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.