Laserfiche WebLink
Veeder-Roof Line Leak Application Guide <br /> Special Installations <br /> Manifolded Line Applications <br /> PLLD and WPLLD leak detection systems can handle product lines supplied by multiple tanks and pumps,to a maximum of 8 <br /> tanks and pumps per product line. <br /> Standard line leak sensing and check valve equipment should be installed at the primary pump. <br /> To perform 0.2 and 0.1 gph tests, a non-vented SwiftCheck valve(P/N 330020-416), or new Red Jacket 65 psi relief valve(P/N <br /> 410153-002),or SpikeCheck Valve Non-PSI Relief Valve for Standard Pump(P/N 410557-002), or FE Petro 65 psi Relief Check <br /> Valve(FE P/N 402459931)should be installed on each of the other pumps supporting the manifolded product line.The Non- <br /> Vented SwiftCheck Valve is rated to a maximum 70 gpm. <br /> NOTE: For 5 HP Maxxum pumps in diesel,an addtional in-line check valve with no pressure relief should be installed <br /> • on the`Slave'pump to prevent backflow. <br /> A relay on a Four-Relay module or 1/0 Combination module(TLS-350)or 1/0 Module(TLS-450) must be available to control <br /> each secondary pump.The standard line leak modules will provide pump control output for the primary pump and the"Pump In" <br /> signal for the set. <br /> A typical manifolded line installation for PLLD is shown below: <br /> To Dispensers <br /> Flexible Pipe with <br /> Flexible Pipe with <br /> Swivel or Union Swivel or Union <br /> Ball Valve Ball Valve Non-Vented <br /> PLLD Sensor/ SwiftCheck <br /> SwiftCheck Valve Valve(if req'd.) <br /> Assembly <br /> B <br /> 1320 <br /> . <br /> a • <br /> ❑ ❑ <br /> Warning Tag Master Pump Slave Pump <br /> p11tl\rnfd1anks.eps Lower Numbered Tank Higher Numbered Tank <br /> Transducer Installation - Red Jacket CPT and Quantum CPT Pumps <br /> This installation procedure is to be used with Red Jacket CPT and Quantum CPT Pumps. <br /> 1. Install the Red Jacket CPT Transducer Adapter Kit(Red Jacket part number 144-326-5)following the instructions with the <br /> kit.Thread the PLLD transducer in the mechanical LLD port of the pump. <br /> QIMPORTANT!Seal any pipe threads using a UL-classified,nontoxic pipe sealant suitable for the fuel involved. <br /> • The figure below illustrates two PLLD transducer installations in Red Jacket CPT pumps-consult"Check Valve Require- <br /> ments"on page 5,to determine what check valve you will need to install to perform your intended level of testing. <br /> 2. Verify that the TLS-350 Console has Version x19 or later(TLS-450 has Version 1 or later)software. <br /> 10 <br />