My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
INSTALL_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 4:43:08 PM
Creation date
5/11/2020 2:26:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2011
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wayne$Bennett DIM Kit Installation Manual Table of Contents <br /> Introduction <br /> General .............................................................................................................................1 <br /> Wayne/Bennett CDIMs and Installation Kits ...................................................................1 <br /> Wayne CDIM Operating Requirements ............................................................................1 <br /> TLS-350R Software Requirements...........................................................................2 <br /> SystemLimitations...................................................................................................2 <br /> Wayne Hardware Requirements..............................................................................2 <br /> WaynePOS Terminals.............................................................................................2 <br /> Bennett CDIM Operating Requirements ...........................................................................3 <br /> TLS-350R Software Requirements...........................................................................3 <br /> SystemLimitations...................................................................................................3 <br /> Contractor Certification Requirements ..............................................................................3 <br /> RelatedManuals ...............................................................................................................3 <br /> SafetySymbols .................................................................................................................4 <br /> SafetyWarnings ...............................................................................................................4 <br /> Wayne / Bennett CDIM Installation <br /> Installing the Wayne or Bennett CAB ...............................................................................6 <br /> Connecting CAB to Wayne or Bennett CDIM in Console .................................................6 <br /> Wayne CDIM Cable Connections <br /> Connecting the Wayne CAB to the Dispenser D-Box .......................................................8 <br /> National Electrical Code Compliance.......................................................................8 <br /> Connecting to Left/Right Dispenser Current Loops..................................................8 <br /> Bennett CDIM Cable Connections <br /> National Electrical Code Compliance..............................................................................11 <br /> Connecting the Bennett CAB to the Dispenser Current Loop .........................................11 <br /> Figures <br /> Figure 1. TLS-350R Console ECPU Board Battery Switch ......................................5 <br /> Figure 2. TLS-350R Console CDIM Installation .......................................................6 <br /> Figure 3. Cable Adapter Box Dimensions ................................................................7 <br /> Figure 4. Example Wayne Dispenser Data Box Current Loop .................................8 <br /> Figure 5. Example CAB connections in Wayne Nucleus Data Box ........................10 <br /> Figure 6. Example Bennett Pump Fuelomat Installation Diagram ..........................12 <br /> Figure 7. Example Bennett Pump Terminal Strip Installation Diagram ..................13 <br /> Figure 8. Example Bennett Pump Interconnect Box Model#405E ........................14 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.