Laserfiche WebLink
Wayne&Bennett DIM Kit Installation Manual Bennett CDIM Operating Requirements <br /> • Verifone <br /> • EDS C-Serve <br /> The tbird-party POS system will be supported by the Veeder-Root CDIM if it communicates to the Wayne Site Controller using the <br /> Wayne PIB. <br /> Bennett CDIM Operating Requirements <br /> The following equipment is required to interface to a Bennett POS System: <br /> 1. TLS-350R with BIR Console(Memory Expansion Module,Part 330532-001,is required in the console for siphon-manifolded <br /> tanks,or for more than 8 tanks). <br /> 2. One Bennett Current Loop Dispenser Interface Module(CDIM)for up to 6 fueling positions(see Table 1 on page 1) <br /> • Each module supports up to three CABs <br /> • Maximum of three CDIMs per console <br /> 3. One Bennett CDIM Installation Kit for every 2 current loops(see Table 1 on page 1). <br /> TLS-35OR SOFTWARE REQUIREMENTS <br /> 1. System software:I I O-XX/3I O-XX,or higher. <br /> 2. Peripheral controller software:330269-OOB,or higher. <br /> 3. DIM software:349780-001 A,or higher.\ <br /> 4. Parameter String:when operating in the metric mode,the last"G"should be replaced with an"IV".Refer to the Veeder-Root TLS- <br /> 350R System Setup manual for further information. <br /> SYSTEM LIMITATIONS <br /> Only Type 92D Dispensers are supported with Orpak Controllers and no blending. <br /> Contractor Certification Requirements <br /> Veeder-Root requires the following minimum training certifications for contractors who will install aid setup the equipment discussed <br /> in this manual: <br /> Level 1 Contractors holding valid Level I Certification are approved to perform wiring and conduit routing,equipment mounting, <br /> probe and sensor installation,tank and line preparation,and line leak detector installation. <br /> Level 2/3 Contractors holding valid Level 2 or 3 Certifications are approved to perform installation checkout,startup,programming <br /> and operations training,troubleshooting and servicing for all Veeder-Root Tank Monitoring Systems,including Line Leak Detection <br /> and associated accessories. <br /> Warranty Registrations may only be submitted by selected Distributors. <br /> Related Manuals <br /> For additional information about installation and setup of Veeder-Root components,you should reference the documents below: <br /> 576013-879 TLS-350R Site Prep and Installation Guide <br /> 577013401 TLS-350R POS Application Guide <br /> 3 <br />