My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
INSTALL_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 4:43:08 PM
Creation date
5/11/2020 2:26:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2011
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wayne&Bennett DIM Kit Installation Manual Connecting the Wayne CAB to the Dispenser D-Box <br /> 2. Select an unused pair of terminals on the left current loop(on TBI or TB3).Connect the stripped white wire from the CAB to the <br /> positive side(+)terminal of the pair.Connect the stripped black wire from the CAB to the negative(-)terminal of the pair.Each <br /> pair of+/-terminals has a Pump Bypass/Auto toggle switch mounted to the right of it.Throw the toggle switch adjacent to the <br /> CAB connected terminals to the right position("AUTO"). <br /> Connect the 'Right Current Loop'CAB to the Wayne Data Box <br /> 1. Get the second 6-foot cable from the install kit with the 3-connector plug on one end and stripped wire leads on the other end(PM <br /> 331105-001).Plug the 3-connector plug end of the cable into the Pump Comm jack on the side of the CAB you marked`Right <br /> Current Loop'.If necessary,trim off the shield/drain wire at the stripped wire end of the cable because it is not used. <br /> 2. Select an unused pair of terminals on the right current loop(on TB2 or TB4).Connect the stripped white wire from the CAB to the <br /> positive side(+)terminal of the pair.Connect the stripped black wire from the CAB to the negative(-)terminal of the pair.Each <br /> pair of+/-terminals has a Pump Bypass/Auto toggle switch mounted to the left of it.Throw the toggle switch adjacent to the CAB <br /> connected terminals to the right position("AUTO"). <br /> Alternative CAB Connection <br /> If ALL S terminal pairs in the Wayne Data Box are in use on one loop,you can connect the CAB to the terminal block at the bottom of <br /> the PC board(T135[for left current loop]or T136[for right current loop])(see Figure 4). <br /> When there are no pump transactions in progress,remove the jumper wire between terminals 4 and 5 of the appropriate terminal block <br /> (TB5 or TB6).Connect the white wire from the CAB to terminal 5,and connect the black wire from the CAB to terminal 4.You do <br /> not set a Pump Bypas/Auto toggle switch when using T135 or TB6.Normal station operation may now resume. <br /> Note:Do not disconnect the dispenser communication wiring during a customer transaction because doing so may result in a loss of <br /> dispenser data.It may also cause the dispenser controller system to hang up. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.