My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
INSTALL_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 4:43:08 PM
Creation date
5/11/2020 2:26:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2011
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Introduction <br /> This manual describes how to identify and assemble the components of the Mag Plus Probe Ethanol-Blended <br /> Gasoline Float Kit on either a new Mag Plus probe or an existing Mag Plus probe (for retrofit restrictions, see Note <br /> 2 in the "Important Requirements for Ethanol-Blended Gasoline Float Kit" paragraph below). <br /> Instructions are included for assembling the Ethanol-Blended Gasoline Float Kit components onto the probe's <br /> shaft, attaching spacer rings to the probe's canister, and attaching the probe's cable to the canister. <br /> For guidelines on site preparation, instructions on installing the probe into a tank, and instructions on connecting <br /> wiring from the probe to the console,you must refer to the appropriate Veeder-Root Site Preparation and <br /> Installation manual. For Setup information,you must refer to the appropriate Veeder-Root Setup manual. <br /> Important Requirements for Ethanol-Blended Gasoline Float Kit <br /> 1. The Ethanol-Blended Gasoline Float Kit requires V30B software or later in the TLS-350 and V3A software or <br /> later in the TLS-450. <br /> 2. You can retrofit existing Mag Plus probes with the Ethanol-Blended Gasoline Float Kit under the following <br /> conditions: <br /> Only probes having Form Numbers 8463xx-1xx,-2xx,or-3xx(Mag7,Ma98 or Ma99)can be used for Phase <br /> Separation. <br /> - Existing canister spacers,floats and boot must be discarded. <br /> 3. The float selection entered during in-tank setup must be as follows: <br /> Console Probe Float Setup Location Float Size(TLS-350)/Float Type(TLS-450)Selection <br /> TLS-350 Mode:Setup,Function:In-Tank Setup,Step:Float Size 4.0 IN.PS <br /> TLS-450 Setup button,Devices button, Probes tab,Float Type field 4.0 IN Phase Separation <br /> 4. The minimum tank water level measured by the Mag Plus Probe with Ethanol-Blended Gasoline Float Kit is <br /> 0.38 of an inch. <br /> S. The Ethanol-Blended Gasoline Float Kit is rated for ethanol blended fuels up to 10%ethanol. <br /> Contractor Certification Requirements <br /> Veeder-Root requires the following minimum training certifications for contractors who will install and setup the <br /> equipment discussed in this manual: <br /> Installer Certification:Contractors holding valid Installer Certification are approved to perform wiring and <br /> conduit routing, equipment mounting, probe and sensor installation, tank and line preparation,and line leak <br /> detector installation. <br /> TLS-350 Technician Certification:Contractors holding valid TLS-350 Technician Certifications are approved to <br /> perform installation checkout, startup, programming and operations training, troubleshooting and servicing for all <br /> Veeder-Root TLS-300 or TLS-350 Series Tank Monitoring Systems, including Line Leak Detection and associated <br /> accessories. <br /> TLS-450 Technician Certification:Contractors holding valid TLS-450 Technician Certifications are approved to <br /> perform installation checkout, startup, programming and operations training,troubleshooting and servicing for all <br /> Veeder-Root TLS-450 Series Tank Monitoring Systems, including Line Leak Detection and associated accessories. <br /> Warranty Registrations may only be submitted by selected Distributors. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.