Laserfiche WebLink
9255517899' Line 1 0" '':35 p.m. 11-04-2010 9/13 <br /> Job#58090.1 <br /> Site Safety Plan <br /> SPECIAL PRECAUTIONS <br /> AND COMMENTS: Correct safety procedures must be followed, per Gettler- <br /> Ryan Inc. Health and Safety Pian and BP COSP. Use <br /> 30lbs/1000 gal capacity dry ice to inert tanks after triple <br /> rinse. <br /> SITE SAFETY WORKPLAN <br /> PERIMETER <br /> ESTABLISHMENT: Work area to be fenced. Use barricades, deleniators <br /> and flagging to restrict access to work zones as <br /> necessary. <br /> PERSONAL PROTECTION: Level of Protection EPA Level D <br /> Surveillance Equipment and Material: CGI <br /> Modifications: Hard hats, safety vests, safety glasses, <br /> and leather safety boots at all times. Nitrile gloves and <br /> hearing protection as needed. <br /> SITE ENTRY PROCEDURES: Sign in sheet required for all personnel. All visitors to site <br /> must wear same PPE as required by Gettler-Ryan Inc. <br /> personnel. <br /> DECONTAMINATION <br /> PROCEDURES: Personnel: Wash thoroughly with detergent solution and <br /> water. <br /> Equipment: Steam clean if necessary <br /> FIRST AID: As applicable <br /> WORK LIMITATIONS: (Time of day, weather, heat/cold stress): None <br /> PROJECT-DERIVED <br /> MATERIAL DISPOSAL: All materials removed from excavation to be sampled, <br /> placed on visqueen on site and covered until classified <br /> for proper disposal or reuse. Old tanks, lines and <br /> rinseate to be off hauled by Belshire environmental.. <br /> Recycle materials to maximum extent possible. <br />