Laserfiche WebLink
Stantec <br /> UST and Line Removal Report <br /> ARCO Service Station No. 6080 <br /> March 15, 2011 <br /> TABLE OF CONTENTS <br /> 1.0 INTRODUCTION AND SITE BACKGROUND.....................................................................1 <br /> 2.0 2010 FUEL SYSTEM UPGRADE SAMPLING ACTIVITIES ................................................1 <br /> 2.1 Site-Specific Health and Safety Plan...........................................................................1 <br /> 2.2 UST Excavation De-Watering .....................................................................................1 <br /> 2.3 Dispenser, Product-Line, and USTs Removal Activities..............................................2 <br /> 2.4 Dispenser and Product-Line Soil Sample Collection ...................................................2 <br /> 2.5 UST Excavation Soil Sample Collection......................................................................2 <br /> 2.6 Stockpile Soil Sample Collection.................................................................................3 <br /> 2.7 UST Excavation De-Watering Sample Collection........................................................3 <br /> 3.0 ANALYTICAL RESULTS ....................................................................................................4 <br /> 3.1 Dispenser and Product-Line Soil Sample Analytical Results.......................................4 <br /> 3.2 UST Excavation Soil Sample Analytical Results..........................................................4 <br /> 3.3 Stockpile Soil Sample Analytical Results.....................................................................4 <br /> 3.4 UST Excavation De-Watering Sample Analytical Results............................................4 <br /> 4.0 WASTE DISPOSAL ACTIVITIES ........................................................................................4 <br /> 4.1 Rinsate Disposal.........................................................................................................4 <br /> 4.2 Piping and UST Disposal ............................................................................................5 <br /> 4.3 Stockpiled Soil Reuse.................................................................................................5 <br /> 5.0 CONCLUSION.....................................................................................................................5 <br /> 6.0 LIMITATIONS......................................................................................................................6 <br /> LIST OF FIGURES <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan with Soil Sample Locations <br /> LIST OF TABLES <br /> Table 1 Tank Pull and Line Upgrade Soil Samples <br /> Table 2 Tank Pull and Line Upgrade Water Sample <br /> LIST OF APPENDICES <br /> Appendix A Field Notes <br /> Appendix B Certified Laboratory Analytical Report and Stantec Lab Validation Form <br /> Appendix C Waste Manifest <br /> 6080 UST and Line Removal Report.doc i <br />