My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY_CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
3500 - Local Oversight Program
>
PR0545660
>
SITE HISTORY_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 3:16:07 PM
Creation date
5/12/2020 1:57:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE HISTORY
FileName_PostFix
CASE 1
RECORD_ID
PR0545660
PE
3528
FACILITY_ID
FA0003909
FACILITY_NAME
PORT OF STOCKTON
STREET_NUMBER
2201
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
02
SITE_LOCATION
2201 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> 315 W. Pine Street, suite 8 <br /> Lodi, CA 95240 <br /> cstron <br /> g.@wgr-sw.com <br /> off: (209)334-5363 ext. 206 <br /> cell. (209)487-4802 <br /> tax: (209)334-5374 <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd:corn] <br /> Sent: Tuesday, September 28, 2010 11:41 AM <br /> To: cstrong@wgr-sw.com: - <br /> Subject: FW: Site UST-#3 - Pilot Test Injetion Well Schedule <br /> Chris, <br /> I'm back in the office now. <br /> 'I <br /> no need to include Mr. Knoll on .this site any longer. I'm your EHD contact for this site. <br /> thanks. <br /> mike <br /> From: Harlin Knoll [EH] <br /> Sent: Wednesday, September 15, 2010 4:25 PM <br /> To: Mike Infurna [EH] <br /> Subject: FW: Site UST#3 - Pilot Test Injetion Well Schedule <br /> update <br /> From: Chris Strong [mailto:cstrong@wgr-sw.com] § <br /> Sent: Wednesday, September 15, 2010 4:21 PM <br /> To: Harlin Knoll [EH] <br /> Cc: rkoehnen@stocktonport.com; 'Jim Neal WGR' <br /> Subject: Site UST#3 - Pilot Test Injetion°Well Schedule' <br /> Hi Harlin, <br /> Yesterday, I spoke with two of the main mangers at Calamco (present occupant at Site UST#3)and was <br /> informed that city permittingcomplications have delayed construction of a new building there. This means <br /> that access is blocked and that install and set up of the Ozone Generator will have to be delayed. It looks <br /> like the installation of the wells will have to be pushed back about a month until late October—early - i <br /> November. I will let you know when we have a specific date the work can be performed. If you want to <br /> discuss the situation further, please feel free to contact me. <br /> Regards, <br /> Chris Strong, PG <br /> Senior Geoiogist <br /> WGR Southwest, Inc. <br /> 315 W. Pine Street, Suite 8 <br /> Lodi,CA 95240 <br /> cstrong�@Mf-sw.com <br /> off: (209)334-5353 ext. 206 <br /> cell: (209)487-4802 <br /> fax: (209)334-5374 <br /> 9/30/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.