Laserfiche WebLink
=,--,Am r-J_<UM P 1 <br /> 4.0 OPERATION <br />' 4.1 Bixsic Operation <br />' I he Screen Point 15 Groundwater Sampler utilizes a stainless steel or PVC Screen which is encased in an <br /> alloy steel samples sheath. An expendable drive point is placed in the lower end of the sheath while a drive <br /> head is attached to the top O-rings on the dnve head and expendable point provide a waterught sheath <br /> which keeps contaminarits out of the system as the sampler is driven to depth Once the desired sampling <br />' interval is reached,extension rods equipped with a screen push adapter are inserted down the inside diam- <br /> eter of the probe rod string. The tool stung is then retracted approximately 44 inches(1118 rum)while the <br />' Sci een is held in place wab the extension rods At this point the system is ready for groundwater Sampling <br /> When sampling is complete, a removable Plus,in the oottom of the screen allows for grouting below the <br /> sampler as the tool string is retrieved <br />' 4.2 Decontamination <br /> In order to collect representative groundwater samples,all Screen Point 15 parts must be thoroughly cleaned <br />' before and after each use Scrub all metal parts using a stiff, long-brstle brush and a nonphosphate soap <br /> solution Stearn Cleaning may be substituted for hand-washing if available Rinse with distilled water and <br /> allow to air-dry before assembly <br />' 43 Samples; Assembly(Fie 4 1) <br />' 1. Install an O-ring on ars expendable drive point (GW-1555) Firmly seat the expendable point in the <br /> necked end of a sampler sheath(GW-1510) <br /> 2. Place d grout plug(Teflon" GW-1550 or PVC GW-1551) in the lower end of a wire-wound stainless <br /> steel(GW-1520)orPVC screen(GW-3530) When using the stainless steel screen,install an O-nno in <br /> the groove on the upper end of the screed Slide the screen inside of the sampler sheath with the grout <br /> plug toward the bottom of the sampler Ensure that the expendable point was not displaced by the <br /> screen <br /> 3. lriscall a bottom O-ring on a drive head (GW-1515) Thread the dnve lead onto the sampler sheath <br /> AnaLh a drive cap (AT-11A) to the top of the drive head The drive head and cap must only be hand <br /> tight Tools are not required as Iong a5 the attachments completely thread together <br /> 4 Sampler assembly is complete <br /> I <br /> I <br /> Standard Operaung Procedure Page 8 Screen Poinr 15 Groundwater Sampler <br />