My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009337
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
3500 - Local Oversight Program
>
PR0545660
>
ARCHIVED REPORTS_XR0009337
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:45:44 PM
Creation date
5/12/2020 2:12:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009337
RECORD_ID
PR0545660
PE
3528
FACILITY_ID
FA0003909
FACILITY_NAME
PORT OF STOCKTON
STREET_NUMBER
2201
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
02
SITE_LOCATION
2201 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.2 PROJECT HEALTH AND SAFETY DIRECTOR <br /> The Project Health and Safety Director(PHSD) shall <br />' 1 Prepare the site health and safety plan and, if necessary, modify the plan based on <br /> changing site conditions or incidents <br />' 2 Provide site specific health and safety training for project personnel <br /> 3 Ensure that this plan and all modifications receive appropriate in-house review <br />' 4 Oversee exposure monitoring to evaluate potential site health hazards <br />' 6.3 SITE SAFETY OFFICER <br /> The Site Safety Officer (SSO) shall <br /> 1 Ensure that appropriate personal protective equipment is available on-site for <br /> consultant personnel <br />' 2 Observe contractor's health and safety procedures If contractor's personnel do not <br /> have appropriate protective equipment to perform work within the S SP standards, the <br /> SSO shall consult with the PM or Client Contact before proceeding with the work <br /> 3 Maintain and calibrate monitoring equipment utilized on-site as frequently as <br /> necessary <br /> 4 Report accidents, incidents or inadequate work practices observed involving <br /> consultant personnel or subcontractors to the PM and Client Contact <br />' 6.4 PROJECT PERSONNEL <br />' Project site personnel shall <br /> 1 Take all reasonable precautions to prevent injury to themselves and to their <br />' co-workers <br /> 2 Perform only those tasks that they can do safely, and immediately report accidents or <br /> ' unsafe conditions to the SSO <br /> 3 Follow the procedures in the site health and safety plan, and report to the SSO any <br /> deviations from the procedures in the plan by consultant personnel, employees of <br /> ' 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.