My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009339
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
3500 - Local Oversight Program
>
PR0545660
>
ARCHIVED REPORTS_XR0009339
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 3:21:11 PM
Creation date
5/12/2020 2:13:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009339
RECORD_ID
PR0545660
PE
3528
FACILITY_ID
FA0003909
FACILITY_NAME
PORT OF STOCKTON
STREET_NUMBER
2201
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
02
SITE_LOCATION
2201 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i • � <br /> 3.1 OBTAINING SAMPLES <br /> 3.1.1 Soil Samples <br /> Soil samples shall be obtained by coring Coring shall be accomplished by driving or pushing ' <br /> a nominal 2-foot long, Geoprobe Large Bore Soil Sampler The sampler shall be fitted with ' <br /> either Teflon or brass liners for collection of soil cores In general, the cores will be retained <br /> for visual inspection and possible subsequent chemical or physical testing. The field geologist <br /> or engineer will carefully record on a field log (Figure B-1) information pertaining to the coring, ' <br /> such as rate of penetration, hydraulic ram pressure or drive-hammer blow count, conng <br /> smoothness, core recovery, and intervals of core loss The cores will be stored and labeled to <br /> show project number, boring number, orientation, and cored interval denoted either by depth ' <br /> or sequential number numbering system <br /> 3.1.2 Groundwater Samples ' <br /> Groundwater samples shall be obtained by driving a Geoprobe Screen Point Sampler into the <br /> formation to be sampled. When desired sampling depth is reached, the sampler will be pulled ' <br /> up about 2 feet, disengaging the expendable dnve point and leaving an open borehole. The <br /> perforated stainless steel sleeve, equipped with a stainless steel mesh screen insert, will be <br /> pushed out into the open borehole, allowing water to enter the sampler. A groundwater sample ' <br /> will then be collected using either a peristaltic pump attached to 318-inch polyethylene sample <br /> tubing, or a bottom check-valve assembly attached to the end of the tubing Tubing will be <br /> discarded after sample has been collected <br /> 3.2 LOGGING OF EXPLORATORY BORINGS ' <br /> The observations of the field geologist or engineer shall be recorded on a soil boring log as <br /> shown on Figure B-1. The probe ng operator and the field geologist/engineer will discuss , <br /> significant changes in material penetrated by the probe, changes in drilling conditions, hydraulic <br /> pressure, and probe penetration rate. The field geologist or engineer will be present during <br /> advancement of soil bonngs and will observe and record such changes by time and depth ' <br /> Core samples shall be examined in the field. A lithologic description shall be recorded on the <br /> log including soil or rock type, grain size, texture, hardness, degree of induration, calcareous t <br /> content, presence of fossils and other materials (gypsum, hydrocarbons), color, relative moisture <br /> content, estimated Unified Soil Classification System (USCS) soil type, and other pertinent ' <br /> information <br /> The original logs shall be sent or delivered to the B&R office in Fresno for review by the t <br /> registered geologist or engineer and the project manager and for storage in the project files <br /> Copies of the bonng logs will be retained in the project field notebook <br /> B - 2 D 1 SI MPAOTOCOL WPN <br />
The URL can be used to link to this page
Your browser does not support the video tag.