My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009339
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
3500 - Local Oversight Program
>
PR0545660
>
ARCHIVED REPORTS_XR0009339
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 3:21:11 PM
Creation date
5/12/2020 2:13:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009339
RECORD_ID
PR0545660
PE
3528
FACILITY_ID
FA0003909
FACILITY_NAME
PORT OF STOCKTON
STREET_NUMBER
2201
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
02
SITE_LOCATION
2201 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 i <br /> 6.1 PROJECT MANAGER <br /> The Project Manager (PM) shall <br /> 1. Direct B&R project activities at the site. <br /> 2. Take responsibility for the site health and safety plan <br /> r personnel are aware of the health and <br /> 3 Ensure that project pe safety requirements <br /> ' for the project including any particular and pertinent client health and safety <br /> requirements <br /> ' 4. Make resources available to provide a safe worlang environment. <br /> ' 5. Inform the Project Health and Safety Director of all pertinent project <br /> developments and plans. <br />' 6.2 PROJECT HEALTH AND SAFETY DIRECTOR <br />' The Project Health and Safety Director (PHSD) shall <br /> 1. Prepare the site health and safety plan and, if necessary, modify the plan based <br /> on changing site conditions or incidents <br /> 2 Provide site specific health and safety training for project personnel. <br /> 3. Ensure that this plan and all modifications utilize appropriate B&R in-house <br /> review. <br /> 4 Oversee exposure monitoring to evaluate potential site health hazards <br /> ' E — 6 D 198117\HASPIAN wPN <br /> BOYAJIAN & ROSS, INC <br /> E <br /> ' Environmental Scientists & ngineers <br />
The URL can be used to link to this page
Your browser does not support the video tag.