Laserfiche WebLink
GEOMA'TRIX <br /> THIRD QUARTER 2004 <br /> GROUNDWATER MONITORING REPORT' <br /> UST Siie No. 3 —Port of Stockton <br /> Stockton California <br /> December 6, 2004 <br /> Project 6437.000 <br /> This'report was prepared by the staff of Geomatrix <br /> Consultants, Inc., under the supervision of the <br /> Geologist whose seal and signature appear hereon. <br /> -� The findings, recommendations, specifications, or <br /> professional opinions are presented within the <br /> limits described by the client, in accordance with <br /> generally accepted professional geologic practice. <br /> \SjE.!R D��o� No warranty is expressed or implied. <br /> P.�os�°c,�� <br /> -N .4155 <br /> * EXP' <br /> �9TFOF CAUF� . <br /> Philip P oss, R.G. <br /> Princilk Hydrogeologist <br /> 1:IPROJECT16000916437.00016437-23.doc <br />