Laserfiche WebLink
0 GF—C7MA1 RIX <br /> soil forming a portion of a temporary equipment access ramp The ramp was constructed for <br /> equipment used to refurbish two anhydrous ammonia storage tanks at a nearby facility (see WGR <br /> letter in Geomatrix, 2004) On May 21, 2004, wells MW3-6,MW3-5, MW3-1, MW3-2, and <br /> MW3-4 (Figure 2) were purged and sampled by WGR in that order Depth to groundwater was <br /> measured in the site monitoring wells before purging Prior to sampling each well, the presence <br /> of separate-phase petroleum hydrocarbon was assessed with a disposable bailer About <br /> 100 gallons of water was purged from each well using a dedicated stinger and vacuum truck <br /> Each dedicated stinger is stored on the site in its own sealed plastic bag Suction on the vacuum <br /> truck line remains on during purging and while making and breaking the connection with the <br /> individual stingers <br /> After purging the initial 50 gallons from each well, a new, clean disposable bailer was used to <br /> collect water from each well for measurement of field parameters Measured field parameters, <br /> which generally comprise electric conductivity (EC), pH, temperature, dissolved oxygen (DO), <br /> and oxidation reduction potential (ORP), were recorded on field data sheets (Appendix A) <br /> During the May sampling round, no ORP measurements were taken by WGR, owing to <br /> • unavailability of an ORP meter After the first set of field parameters was collected and water <br /> levels had recovered, an additional 50 gallons of water was purged with the dedicated stinger <br /> New clean disposable bailers were used to collect groundwater samples for field parameters and <br /> laboratory analysis of total petroleum hydrocarbons quantified as gasoline (TPHg) and benzene, <br /> toluene, ethylbenzene, and xylenes (BT'EX) <br /> Groundwater samples collected by WGR were preserved and transported under chain-of-custody <br /> (Appendix B) procedures to Precision Enviro-Tech Analytical Laboratory (PET) in Stockton, <br /> California, a state-certified laboratory The groundwater samples from the five sampled site <br /> monitoring wells were analyzed by PET for TPHg and BTEX using U S Environmental <br /> Protection Agency (EPA) Method 8260B <br /> In addition to required quarterly sampling conducted by WGR, Geomatrix collected groundwater <br /> samples from the site monitoring wells On April 1, 2004, Geomatrix collected groundwater <br /> samples from groundwater monitoring wells MW3-2, MW3-1,MW3-6, MW3-4, and MW3-5 in <br /> that order On May 18, 2004, Geoznatrnx collected groundwater samples from groundwater <br /> monitoring wells MW3-2, MW3-5, and MW3-4 in that order Geomatrix used a clean non- <br /> dedicated submersible pump to purge groundwater at about 1 to 2 gallons per minute from each <br /> well The wells were purged until at least four well casing volumes were removed and field <br /> parameters consisting of pH, temperature, and EC had stabilized (Appendix A) Field <br /> I TROJECT1G(WsW17 00016437 21 doe 2 <br />