My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
REMOVAL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 3:54:20 PM
Creation date
5/12/2020 2:43:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1999
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16en*. By: -air and Associates; 925 880 7878; Mar 1 9S -' AM; Page 2 <br /> SITE WORK AND HEALTH SAFETY PLAN <br /> I . GENERAL <br /> This Health and Safety Plan has been designed to conform to <br /> and/or exceed guidance standards promulgated by EPA and the <br /> California Department of Health Services, Federal OSHA <br /> regulations (29CFP.1910. 120) and CALiOSHA regulations. Because <br /> considerable experienced judgement must be applied to decisions <br /> that will be made while actually working on site, it is the goal <br /> Of this p_an to provide Alaxirtum word: efficiency while <br /> maintaining an uncompromisingly sa=e working environment. This <br /> plan is not a substitute for experienced judgement andl <br /> direct=on, or for common sense dur_ng construction activities , <br /> Gettler-Ryan Inc. , will provide services and equipment for the <br /> completion of the scope of work. Gettler-.Ryan Ir.c. , (as well as <br /> all subcontractors and independent contractor) will adhere to <br /> the Site Work Health and Safety Plan. <br /> 2. WORK O3JECTIyE <br /> The overall work objective is to provide fcr proper and safe <br /> completion of scope if work. <br /> 3. SAFETY MANAGEMENT <br /> The field supervisor, Jim, [rict..o_s, is the site and safety <br /> officer and will ensure char all personnel comply with all <br />
The URL can be used to link to this page
Your browser does not support the video tag.