Laserfiche WebLink
L <br /> L <br /> 3.4 HEALTH AND SAFETY <br /> B&R Health-and Safety plan for the subsurface investigation is provided in Appendix E. A <br /> Lcopy of this plan will be available on-site during the field work. This plan is not intended for <br /> use by other contractor's personnel involved with this work. <br /> 4.0 SCHEDULE <br /> L B&R estimates that thePo ro sed scope of work can be completed within 8 to 10 weeks <br /> P <br /> following the approval of this work plan. <br /> L 5.0 REFERENCES <br /> Bartow, J. Alan and Tor H. Nilsen, 1990, "Review of the Great Valley Sequence, Eastern <br /> Diablo Range and Northern San Joaquin Valley, Central California," USGS Open File <br /> Report 90-226. <br /> LCentral Valley Regional Water Quality Control Board, 1991, "Appendix A To Tri-Regional <br /> Recommendations -- Reporting," August 30, 1991. <br /> LEMCON> 1998 "Fourth Quarter 1997 Groundwater Monitoring Report, Port of Stockton," <br /> report prepared for Stockton TerminalsTechnical Committee, March 27, 1998. <br /> North Coast, San Francisco Bay, and Central Valley Regional Water Quality Control Boards, <br /> 1990, "Tri-Regional Board Staff Recommendations for Preliminary Investigation and <br /> L Evaluation of Underground Tank Sites," August 10, 1990. <br /> LSierra-Pacific Groundwater Consultants, Inc., 1994, "Results of Soil Investigation at 2130 <br /> West Washington Street Facility, Stockton, California," report prepared for Unocal <br /> Corporation, Figure 11. Cross Section Between Borings P-3$Nd P-46,.May 11, 1994. <br /> 1998, "First-Semi-Annual 1998 Monitoring Report and Request for Regulatory <br /> Closure, Former PureGro Molasses Feed Product Facility, 2130 West Washington <br /> Street Stockton," April 1.7 1998. <br /> L 7 <br /> 98117L55UST6dV.wPN <br /> 13R. BOYAJIAN & ROSS,"INC. <br /> Environmental Scientists & Engineers <br />