My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 4
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
3500 - Local Oversight Program
>
PR0545660
>
WORK PLANS_CASE 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 4:10:39 PM
Creation date
5/12/2020 3:21:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
CASE 4
RECORD_ID
PR0545660
PE
3528
FACILITY_ID
FA0003909
FACILITY_NAME
PORT OF STOCKTON
STREET_NUMBER
2201
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
02
SITE_LOCATION
2201 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
41 <br /> b. Describe the method that will be utilized to purge and/or Inert the tank(s)s 15 lbs. <br /> After tri le rinse rocedure del are llande3�ddbs.ater1�00ate1 ca aclt <br /> er 1000. 1. ca acit for dies <br /> asoline. . <br /> b. Tank/Plping Haulort. <br /> 3 Name Jim Thor e Oil Inc./ DBA Rich rt Construction. h <br /> 3 1 T�. Beclanan Rd. <br /> City_ Lodi Zip 952.40 <br /> Addreas <br /> Phone No. 20 368-61 5/ 462--4581 <br /> L <br /> Mauler Registration # (if hauled as hazardous) 266 <br /> C. Tank/Piping Disposal Site: <br /> Name Schnitzer Steel Products <br /> Address 12000 Folsom Blvd.-- Cit?Rancho Cordova Zip_ 95742 - <br /> Phone No. 1C. 1L__) 985-4$10 <br /> EPA ID# (if transported to a permitted TSD facility) <br /> �1. Describe, In detail, hour the soil and/or water samples) beneath the tank and piping wlllbe obtalneds <br /> After tank s has been removed contractor will di a roximatel Z to 3 feet <br /> p <br /> under the fill or um end or ends into undisturbed soil with the bac oe. <br /> will be taken at the direction of SJPHS/EHD re resentitive from the bac hoe ucket: <br /> Sate li rotoco]- is outlined on "Sam lin ProtocolEor Routine Tank Removal enclosed. <br /> 10. Deacribe how the excavation will be backfilled with suitable material upon removal: <br /> Back fill of the excavation will be completed at thea ro riate <br /> time during the <br /> ro ect. A determination of the most cost effective method will be made and <br /> undertaken, Materials used ma be sand loam ea ravel or other ma erxa �I <br /> 11. Handling of excavated soli: <br /> n) What material will be used to line the tank pit and cover the stockpile? <br /> Heavy duty lastic sheeting. <br /> b) What will be the final destination of the excavated stockpile? <br /> Spoil dispos'istion decisions will be made after sample analyses are studied <br /> and contamination levels are aetermined. <br /> c) Contaminated soil Hazardous Waste Haulers <br /> Name � <br /> Dillard Trucking Hander Reglistration 'F 1715 <br /> Address 3291 Byers Rd. RT. 1 bx. 73 Clty Byron, Zip 94514 <br /> Phone No. 51Q ___) 634-6850 <br /> Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.