Laserfiche WebLink
PROJECT: evron 96171 WELL/PROBEHOLE/BOREHOLE NO: <br /> (3�LOCATION:6633 Pacific Avenue /� Sta me C <br /> PROJECT NUMBER:213202493 BA-1 PAGE 1 OF 2 <br /> DRILLING/INSTALLATION: NORTHING(ft): EASTING(ft): <br /> STARTED 7/29/14 COMPLETED: 7/31/14 LAT: LONG: <br /> GROUND ELEV(ft): TOC ELEV(ft): <br /> DRILLING COMPANY:National EWP <br /> INITIAL DTW(ft):35 WELL DEPTH(ft):N/A <br /> DRILLING EQUIPMENT:CME 85 STATIC DTW(ft):Not Measured BOREHOLE DEPTH(ft):40.0 <br /> DRILLING METHOD:Hollow Stem Auger WELL CASING DIA.(in):N/A BOREHOLE DIA.(in):8 <br /> SAMPLING EQUIPMENT:Split Spoon LOGGED BY:V.Blanchard CHECKED BY:B.Westhoff <br /> xs L `—' cn °' > m Well <br /> a o v Descri tion E Time N U iv a 0 °o.� a a� Construction <br /> o ' �� p Sample ID �� °w' mU ma o ' <br /> 10 inches of concrete <br /> Concrete <br /> CL SANDY LEAN CLAY;CL; 10 YR 4/2 dark <br /> grayish brown;fine to medium sand-grained; <br /> medium plasticity;soft;moist;(0,30,0,70) <br /> zi 13:15 1.5 22 0.1 <br /> 13:15 5 BA-1 @4.5 5 <br /> Boring cleared with Airknife to 8 feet 1 inch <br /> prior to drilling <br /> 10:40 3 <br /> ML SILT;ML;7.5 YR 4/3 brown;low plasticity; 1.5 7 0.0 <br /> 10:40 10 soft;moist;with clay;(0,0,75,25) BA-1@10 9 10 <br /> o <br /> 10:45 4 Same as above except 10 YR 4/3 brown 1.5 12 0.0 <br /> m 10:45 15 BA-1614.5 21 15 <br /> 0 <br /> 0 <br /> F <br /> 5 <br /> LU <br /> LU <br /> 0 <br /> w <br /> U <br /> H <br /> z 5 <br /> co Same as above except 10 YR 5/4 yellowish BA10:5;9 5 1.5 13 0.0 <br /> a 10:51 20 brown,dry @ 14 20 <br /> c� <br /> ; Neat Cement <br /> a Grout <br /> M <br /> D <br /> 'o <br /> x <br /> m <br /> 0 <br /> c' <br /> 0 <br /> O <br /> 5 <br /> Uj SP POORLY GRADED SAND;SP; 10 YR 3/3 10:56 1.5 15 0.0 <br />