Laserfiche WebLink
PROJECT:Chevron 96171 WELL/PROBEHOLE/BOREHOLE NO: <br /> LOCATION:6633 Pacific Avenue 4 Sta ntec <br /> PROJECT NUMBER:213202493 BA-2 PAGE 2 OF 2 <br /> DRILLING/INSTALLATION: NORTHING(ft): EASTING(ft): <br /> STARTED 7/29/14 COMPLETED: 7/31/14 LAT: LONG: <br /> GROUND ELEV(ft): TOC ELEV(ft): <br /> DRILLING COMPANY:National EWP <br /> INITIAL DTW(ft):35.0 WELL DEPTH(ft):N/A <br /> DRILLING EQUIPMENT:CME 85 STATIC DTW(ft):Not Measured BOREHOLE DEPTH(ft):40.0 <br /> DRILLING METHOD:Hollow Stem Auger WELL CASING DIA.(in):N/A BOREHOLE DIA.(in):8 <br /> SAMPLING EQUIPMENT:Split Spoon LOGGED BY:V.Blanchard CHECKED BY:B.Westhoff <br /> v °1 <br /> ass 2 cn °' m > Well <br /> a o v Z::- <br /> Description tion E Time u a, -2 :3 N .= a a) Construction <br /> Dov �� p SamplelD = m�j ma p� <br /> °' <br /> x <br /> 15:27 8 <br /> ML SILT ML;7.5YR 4/3 brown;low plasticity; 1.5 16 0.0 <br /> 15:27 30 soft;moist;with clay; (0,0,75,25) BA-2@30 22 30 <br /> Same as above except 10 YR 4/33 dark 15:35 1.5 0 0.0 <br /> 15:35 35 brown,medium plasticity,wet BA-2@34.5 14 35 <br /> N <br /> m <br /> o SP POORLY GRADED SAND;SP; 10 YR 3/3 16:05 1.5 2 0.0 <br /> 60 16:05 40 dark brown;fine-grained; loose;wet; BA-2@39.5 12 40 <br /> (0,100,0,0) <br /> W Borehole terminated at 40 feet. <br /> LU5 <br /> LU <br /> 0 <br /> w <br /> U <br /> H <br /> 2 <br /> H <br /> U <br /> a' 45 45 <br /> x <br /> D <br /> 00 <br /> x <br /> a <br /> m <br /> 0 <br /> m <br /> f <br /> 0 <br /> O <br /> LL <br /> 0 <br /> W <br />