Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 4 of 6 <br /> VIII, MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel Is used to perfonn leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational? ® ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, ❑ ❑ <br /> 01 <br /> functionally tested and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not Interfere with their ❑ ❑ <br /> proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? ® ❑ ❑ <br /> Was the monitoring panel's backup battery visually Inspected, functionally tested, and confirmed operational? ® ❑ ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically ❑ ❑ <br /> disconnected? <br /> Does the turbine automatically shut down If the piping secondary containment monitoring system detects a leak? ❑ ❑ <br /> Which sensors initiate positive shut down? (Check all that apply.) ❑ Sump ❑ Under-dispenser containment <br /> If alarms are relayed to a remote monitoring station , is all communications equipment (e.g. modem) operational? © ❑ In <br /> Foran answer of 'W" aboyes describe In section W how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> The 91 annular sensor was replaced due to failure during the Monitoring Certification on 6/14/2019 <br /> The 91 annular sensor was replaced 'like for like " Model 794390409 Serial # 1374554 <br /> The 91 annular sensor activated an audible and visual alarm when tested <br /> X. IN TANK GAUGING TESTING <br /> ® Check this box if tank gauging is used only for inventory control. (Do not complete this section.) <br /> ❑ Check this box if NO tank gauging equipment is installed. (Do not complete this section) Y N NA <br /> This section must be com l*ted if in tank gauging Is used to peribrin leak detection monitodn . <br /> Has all Input wiring been inspected for kinks and breaks In the cables and for proper entry and termination, Including testing for ground ❑ ❑ ❑ <br /> faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally tested, ❑ ❑ ❑ <br /> and confirmed operational? <br /> Was accuracy of system's product level readings tested? ❑ ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ ❑ <br /> Were all probes reinstalled properly? ❑ ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ ❑ <br /> For anv answer of "N" above describe in section XI how and when these deficiencies were or will be corrected <br /> XI. COMMENTS <br /> V - VPQ N Nn NA a Nnt Amir=Na <br />