Laserfiche WebLink
lUL 2020 <br /> UNDERGROUND STORAGE TANKi fl f1,'i I' : . 1 E F Y` ; W w <br /> MONITORING SYSTEM CERTIFICATION FORM (Page a of 6 <br /> Ville MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel Is used to perform leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational? ro <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely,functional) tested and confirmed o erational? <br /> Were ail sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their ® ❑ <br /> ro r o eration? <br /> Was monitoring system set-up reviewed to ensure proper settings? ® ❑ <br /> Was the monitoring panel's backup battery visually inspected, functionally tested , and confirmed operational? ® ❑ ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? ® ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or Is electrically ® ❑ ❑ <br /> disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? ® ❑ ❑ <br /> Which sensors Initiate positive shut down? (Check all that apply.) ® Sump ® Under-dispenser containment <br /> If alarms are relayed to a remote monitoring station , is all communications equipment (e.g . modem) operational? ❑ ❑ <br /> For any answer of "N" above describe in section Mhow and when these deBclencles were or will be corrected. <br /> IX. COMMENTS <br /> UDC and STP sensors initiate positive shutdown <br /> X. IWTANK GAUGING TESTING <br /> ID Check this box if tank gauging Is used only for inventory control. (Do not complete this section.) <br /> ❑ Check this box if NO tank gauging equipment is installed. (Do not complete this section.) Y N NA <br /> This section must be completed If fn-tank gauging is used to perfonn leak detection monitorin . <br /> Has all input wiring been Inspected for kinks and breaks in the cables and for proper entry and termination, Including testing for ground ❑ ❑ ❑ <br /> faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally tested, r <br /> 11 <br /> and confirmed operational? <br /> Was accuracy of system's product level readings tested? 11 11Was accuracy of system's water level readings tested? ❑ 11Were ail probes reinstalled properly? ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ RffFo <br /> For any answer of "N" above describe in section XI how and when these deficiencies were or will be corrected. <br /> XI. COMMENTS <br /> E <br /> l <br /> j Y = Yac N a Nn NA a Nnf Anr41mt 4+ <br />