Laserfiche WebLink
I of 1 <br /> Wrois DRILLING LOG PROJECTNO. 3134-100 <br /> Su ervisin Geolo ist: Tim Berger,R.G. 5225 Site Name: Calif Arm National Guard Facility-Stockton <br /> Lo B Kevin Sheridan Borin No: B-15c <br /> Date: 3/18/00 Borin Diameter: 1.75 Inch <br /> DrillingContractor: Precision Sampling,Inc. Boring De the 5 Feet <br /> Contractor Lic.No. 636387 Borin Location: CSMS area adjacent to ditch alongStimson <br /> R Type: Geo robe 5400 Road <br /> Driller: Ser 'o Navarro/Eugene Ta alla <br /> USCS SOIL DESCRIPTION <br /> SOIL CONDITION AND GEOLOGIC INTERPRETATION <br /> o E <br /> :. :: o a <br /> F o C7 o SOIL TYPE,COLOR,MOISTURE,STAINING,DENSITY,ODOR, SORTING, <br /> r c U 3 ,. U o PERCENT FINES,ROUNDING,SECONDARY POROSITY �+ <br /> > o ] a GEOLOGY:FILL,ALLUVIUM,BEDROCK n <br /> 3 .o <br /> xcow3 , <br /> x <br /> 2" asphalt pavement at surface <br /> 2 �1 Sample B 15c-1-0 collected. <br /> 0.0 <br /> CLAYEY SILT;olive brown,moist,no staining, firm, no odors, 10 to 20%clay,non-plastic <br /> massive, trace fine to mediumsand. 0.0 <br /> Samples B15c-2-5 and SV-B15c-5 collected. <br /> 5 Boring terminated at 5'bgs. Groundwater not encountered. <br />